Learning Questions | True / False | Multiple Choice | Matching | Exercises | Short Answer | Problems |
1. How are costs assigned to mass-produced products? | 1 | 1, 31, 32
S: 83
W: 103, 104, 111, 113, 115 | | | 3 | 1 |
2. What are equivalent units, and how do they relate to the production process? | 2-4, 8 | 15, 33
S: 73-75
W: 102, 105-107 | | 4 | | 2 |
3. How is the weighted average method used in process costing? | 5-7 | 3, 4, 6, 11-14, 16, 36
S: 77, 79, 82, 84, 86
W: 109 | | 2-8, 10 | 1 | 1 |
4. How is the FIFO method used in process costing? | 9-11 | 2, 5, 7-10, 17, 18, 34, 35, 37, 48, 49
S: 76, 78, 85
W: 114, 116-120 | | 1, 4, 7, 9 | 1, 4 | 3, 4, 5 |
5. What alternative methods are used for mass production? | 13-15, 21, 22 | 43-47 | 1 | | 4, 8 | |
6. How is process costing performed for multiple production departments? | 12, 16 | 19-30, 38
S: 80, 81, 87, 88, 99, 100
W: 112 | | 3, 6, 9, 10 | 14 | 1 |
7. How are spoilage costs handled in process costing? | 17 | 39-42, 50-71
S: 89-98
W: 110 | | 3 | 5-7, 9-11, 14 | 3 |
8. How does process costing information affect managers’ incentives and decisions? | 20 | S: 72
W: 101, 108 | | | 2, 4, 12, 13 | 1, 2, 5 |
S: Questions from the study guide
W: Questions from web quizzes on the student web site
Level of Complexity* | True / False | Multiple Choice | Matching | Exercises | Short Answer | Problems |
Foundation: Repeat or paraphrase information; Reason to single correct solution; Perform computations; etc. | All | All | All | All | 1, 5, 6, 14 | 1, 3, 4, 5 |
Step 1: Identify the problem, relevant information, and uncertainties | | | | | 2, 3, 4, 10, 12, 13 | 1, 2, 3 |
Step 2: Explore interpretations and connections | | | | | 7, 8, 9, 11 | 1, 2 |
Step 3: Prioritize alternatives and implement conclusions | | | | | | 3 |
Step 4: Envision and direct strategic innovation | | | | | | |
*Based on level in Steps for Better Thinking (Exhibit 1.10, textbook p. 16):
Note: Step 1, 2, 3, and 4 questions in this test bank are intentionally open-ended and subjective, giving students the opportunity to demonstrate skills such as judgment, reasoning, identification of uncertainties, identification or analysis of pros and cons, and so on. Therefore, student answers may not exactly match those shown in the solutions.
True / False
- Conversion costs refer to the cost of direct labor and production overhead.
- Equivalent units measure the resources used in partially completed units relative to the resources needed to complete the units.
- Equivalent units are calculated for work in process and finished goods inventory.
- Conversion costs must be incurred uniformly throughout the production process to calculate equivalent units.
- When using the weighted average method to calculate cost per equivalent unit, the cost is calculated as current period costs / equivalent units for total work.
- In the weighted average method, costs from beginning work in process are averaged with costs incurred during the current period and then allocated to units completed and ending work in process.
- In the weighted average method, cost per equivalent unit is often calculated separately for materials costs and conversion costs.
- Managers can calculate costs per equivalent unit using the weighted average or the FIFO method.
- In FIFO costing, the costs of units in beginning work in process are merged with current period costs to calculate the cost per equivalent unit.
- Managers can only use FIFO process costing if it is reflected in the physical flow of units.
- In calculating the cost per equivalent unit using FIFO costing, the appropriate formula is current period costs / equivalent units for work performed this period.
- In a process costing system, direct materials are added during every production process.
- Conversion costs may be separated into direct labor and overhead when it is relatively easy to track direct labor and the use of labor occurs in a different pattern than the use of overhead resources.
- Process costing is simplified when a company uses just-in-time inventory methods.
- When an organization uses a long-term procurement contract, direct labor costs are normally stable over long periods of time.
- In a process costing system with multiple production departments, costs from the first department’s ending work in process are transferred to the second department’s finished goods before going into the second department’s work in process.
- In a process costing system, normal spoilage is allocated to good units produced.
- All spoilage in a process costing system is considered abnormal spoilage.
- Spoilage costs from an unusual natural disaster would be allocated to good units produced in a process costing system.
- Process costing information is useful for measuring and monitoring production processes.
- Standard cost equivalent units are calculated the same way as FIFO equivalent units.
- When standard costs are used as benchmarks, they are compared to actual costs using either weighted average or FIFO costs.
Multiple Choice
- Perry Company started 6,000 units during the month of March. 600 units were in the beginning work in process inventory and 400 units in the ending work in process inventory. Units completed and transferred out during March will be
- 6,000
- 6,400
- 6,200
- 5,400
Use the following information for the next 3 questions.
Salmon Manufacturing Company uses a process costing system. Direct materials are added at the beginning of the process. During January, Department Q had a beginning inventory of 2,000 units, 25% complete for conversion costs. During the month 14,000 units were started and there were 1,000 units in ending inventory, 60% complete for conversion costs.
- Using FIFO process costing, the equivalent units for direct materials for the month were
- 13,600
- 14,000
- 16,000
- 15,600
- Using weighted average process costing, the equivalent units for direct material for the month were
- 13,600
- 14,000
- 16,000
- 15,600
- Using weighted average process costing, the equivalent units for conversion costs for the month were
- 14,100
- 14,000
- 16,000
- 15,600
Use the following information for the next 2 questions.
Gholson, Inc. employs a process costing system in which direct materials are added at the beginning of the process. Direct material costs from the prior period for beginning work in process are $1,250. The current period’s direct material costs total $31,500. The company began the period with 500 units, 70% complete, started 10,500 units, and finished the period with 1,000 units, 40% complete.
- Using a FIFO system, the direct material cost per equivalent unit is
- $3.00
- $2.98
- $3.20
- $2.55
- Using the weighted average method, the direct material cost per equivalent unit for the period is
- $3.00
- $2.98
- $3.20
- $2.55
Use the following information for the next 8 questions.
Hendrix, Inc. employs a process costing system. Direct materials are added at the beginning of the process. Here is information about July’s activities:
On July 1: Beginning inventories = 750 units, 60% complete
Direct materials cost = $5,925
Conversion costs = $4,095
During July: 15,000 units started
Direct materials added = $150,000
Conversion costs added = $83,520
On July 31: Ending inventories = 1,500 units, 40% complete
- Using the FIFO method, the number of units started and completed in July was
- 14,250
- 15,000
- 13,500
- 15,750
- Using the FIFO method, the number of equivalent units of conversion costs was
- 14,400
- 14,550
- 14,850
- 14,700
- Using the FIFO method, the cost per equivalent unit for materials used during July was
- $9.90
- $9.80
- $11.11
- $10.00
- Using the FIFO method, the cost of goods completed and transferred out during July was
- $225,150
- $225,060
- $213,300
- $213,000
- Using the weighted average method, the number of equivalent units of material was
- 15,750
- 14,250
- 15,000
- 13,500
- Using the weighted average method, the cost per equivalent unit for conversion costs was
- $5.80
- $5.90
- $6.00
- $6.10
- Using the weighted average method, the cost of the goods completed and transferred out was
- $225,150
- $225,060
- $213,300
- $213,000
- Using the weighted average method, the cost of the ending work in process inventory for July was
- $18,480
- $18,540
- $18,330
- $18,390
- On September 1, Kelita Company had 20,000 units in process, which were 30% completed. Materials are added at the beginning of the process. During the month 160,000 units were started and 170,000 completed. Ending work in process was 50% complete. By what amount would the equivalent units of materials differ if weighted average were used instead of FIFO?
- 20,000 more
- -0-
- 6,000 more
- 14,000 less
- Assume that ending work in process is 8,000 units, 20% complete, and that 20,000 units were started during the month. The beginning work in process was 75% complete. Materials are added at the beginning of the process, and the cost of materials are added during the month was $61,500. Using the weighted average method, materials are allocated at $4.00 per equivalent unit. The cost of material included in the beginning work in process from last month was
- $18,500
- $20,000
- $34,500
- None of the above
Use the following information for the next 2 questions.
Assume there were 6,000 units in beginning work in process, 60% complete. 20,000 units were completed during the month. Ending work in process is 40% complete, which is equivalent to 3,200 units for conversion costs. Materials are added at the beginning of the process. The FIFO method is used.
- The number of equivalent units of conversion costs is
- 23,200
- 17,680
- 19,600
- 21,280
- The number of units started this month is
- 20,000 units
- 22,000 units
- 28,000 units
- 15,280 units
Use the following information for the next 10 questions.
Zuniga, Inc. uses a process costing system. During May, 1,200 units were transferred into Department 2 at a cost of $38,040. Direct materials are added at the beginning of the process. Additionally:
On May 1: Beginning inventories = 250 units, 40% complete
Direct materials costs = $1,250
Conversion costs = $1,356
Transferred-in costs = $2,560
During May: Direct materials costs incurred = $6,000
Conversion costs incurred = $17,013
On May 31: Ending Inventories = 350 units, 20% complete
- Using the FIFO method, units transferred in and completed were
- 1,200
- 1,100
- 850
- 1,450
- Using the FIFO method, the equivalent units of material were
- 1,200
- 1,100
- 850
- 1,450
- Using the FIFO method, the cost per equivalent unit for transferred-in units was
- $28.00
- $31.70
- $26.23
- $33.87
- Using the FIFO method, the cost of the beginning work in process units transferred out was
- $2,385
- $15,476
- $7,551
- $6,756
- Using the FIFO method, the cost of the ending work in process was:
- $2,863
- $7,113
- $12,649
- $13,958
- Using the weighted average method, the number of equivalent units for conversion costs was
- 1,070
- 1,020
- 1,170
- 1,380
- Using the weighted average method, the total transferred-in costs for the month were
- $38,040
- $40,600
- $30,800
- $33,360
- Using the weighted average method, the cost per equivalent unit for materials was
- $5.00
- $4.14
- $6.04
- $4.44
- Using the weighted average method, the cost of the units transferred out was
- $53,570
- $44,710
- $52,261
- $66,219
- Using the weighted average method, the cost of the ending work in process inventory was
- $13,958
- $13,944
- $12,663
- $12,649
Use the following information for the next 2 questions.
Assume a company’s beginning work in process consists of 20,000 units, 40% complete. Materials are added at the beginning of the process. During the month, 90,000 units are transferred in. The ending work in process consists of 10,000 units, 50% complete.
- Using the weighted average method, the equivalent units of production for the month are
Transferred In Materials Conversion Costs
- 110,000 100,000 65,000
- 90,000 100,000 97,000
- 110,000 110,000 105,000
- 105,000 60,000 100,000
- Using the FIFO method, the equivalent units of production are
Transferred In Materials Conversion Costs
- 90,000 90,000 97,000
- 110,000 100,000 105,000
- 110,000 92,000 105,000
- 90,000 100,000 105,000
- A costing system that determines an average cost for all units of product in a particular time period is a
- Job costing system
- Batch costing system
- Process costing system
- Direct costing system
- Which type of company would most likely use a process costing system?
- Chemical producer
- Custom furniture maker
- Printer
- Ship builder
- Equivalent whole units of production
- Are the number of whole units produced in a batch
- Include the number of units started and completed during the period
- Compares the number of units that should have been completed with that actually produced
- Consists of all units completed this period
- Materials are added at the beginning of the process. The beginning work in process is 30% complete. The total equivalent units for direct materials for the period using FIFO is equal to
- The units in beginning work in process
- The units started this period
- The units started plus 70% of the units in beginning work in process
- The units started and completed plus the beginning work in process
- Production costs during the current period are kept separate from that of the previous period in the
- FIFO method
- Job costing method
- Just-in-time method
- Weighted average method
- When using weighted average process costing
- The costs attached to beginning work in process are kept separate from all other costs
- The current period costs will be added to the beginning work in process costs.
- Units in the ending inventory are not considered in making equivalent unit computations.
- Completed units are transferred out in two separate blocks.
- Because the weighted average and FIFO methods treat beginning inventory differently, if a firm has beginning inventory in a process costing system and the FIFO method is used, it will
- Always have a higher number of equivalent units of production for conversion costs than weighted the average method
- Always have a lower number of equivalent units of production for conversion costs than the weighted average method
- Always have a higher cost per equivalent unit than the weighted average method for materials
- Always have a lower cost per equivalent unit than the weighted average method for conversion costs
- In a process costing system, transferred-in costs
- Are computed for all production but not reported in the cost of process costing report
- Usually do not include any indirect costs
- Are the costs recorded in preceding departments
- Are the costs of the completed units
Use the following information for the next 4 questions.
Tong, Inc. is a manufacturing company that uses a process costing system. All direct material is added at the start of the process, and spoilage is discovered at the end. During the first period of operations 15,000 units of material were placed into production at a cost of $20 each (ignore conversion costs for this process). Ending work in process was 2,000 units, good units completed totaled 11,000 units, and normal spoilage is 15% of the units surviving inspection. Inspection takes place after the units are completed.
- The unit cost assigned to the abnormal spoilage is
- $-0-
- $22.61
- $20.00
- $24.00
- The unit cost assigned to the normal spoilage is
- $-0-
- $22.61
- $20.00
- $24.00
- The unit cost assigned to the ending work in process inventory is
- $-0-
- $22.61
- $20.00
- $24.00
- The unit cost assigned to the good units completed is
- $-0-
- $20.00
- $24.00
- $23.00
- Assume a company’s beginning work in process consists of 20,000 units, 40% complete. Materials are added at the beginning of the process. During the month, 90,000 units are transferred in. The ending work in process consists of 10,000 units, 50% complete. Under the standard cost method, the equivalent units of production are
Transferred In Materials Conversion Costs
- 90,000 90,000 97,000
- 110,000 100,000 105,000
- 110,000 92,000 105,000
- 90,000 100,000 105,000
Use the following information for the next 2 questions.
Assume there were 6,000 units in beginning work in process, 60% complete. 20,000 units were completed during the month. Ending work in process is 40% complete, which is equivalent to 3,200 units for conversion costs. Materials are added at the beginning of the process. The standard cost method is used.
- The number of equivalent units of conversion costs is
- 23,200
- 17,680
- 19,600
- 21,280
- The number of units started this month is
- 20,000 units
- 22,000 units
- 28,000 units
- 15,280 units
More Difficult Multiple Choice
These multiple choice questions require more complex computations or present information differently than in the textbook.
Use the following information for the next 2 questions.
Assume there were 6,000 units in beginning work in process, 60% complete. 20,000 units were completed during the month. Ending work in process is 40% complete, which is equivalent to 3,200 units for conversion costs. Materials are added at the beginning of the process. The standard cost method is used.
- Assume that conversion costs are $122,100 for the month, and the equivalent unit cost for conversion is $5.50. The ending work in process is 80% complete, and the beginning work in process consisted of 2,000 units, 40% complete. The company completed 17,000 units. What is the number of whole units in the ending work in process under the FIFO method?
- 6,000 units
- 6,500 units
- 7,500 units
- 5,200 units
- Assume the total conversion costs allocated to the completed units was $91,650. What amount of conversion costs are attached to the beginning work in process at the beginning of the month?
- $1,850
- $2,550
- $4,400
d None of the above
Use the following information for the next 2 questions.
Xeno, Inc. operates a process costing system and uses the FIFO method. Beginning work in process consists of 1,000 units, 30% complete. Ending work in process is 15% complete, and direct materials are added at the 20% point. The equivalent units of production for materials are 14,000 and for conversion costs are 18,000.
- The number of units in ending work in process was
- 37,000
- 14,000
- 18,000
- 22,000
- The number of units started this month was
- 15,000
- 18,000
- 36,000
- 37,000
Use the following information for the next 6 questions.
Miramar, Inc. uses a weighted-average process costing system which recognizes normal spoilage as 5% of good output. During the current period, 14,000 units were started and 10,000 units completed. Materials are added at the beginning of the process, conversion costs occur uniformly, and the inspection point is at the 70% point. Beginning work in process was 6,000 units, 40% complete, and ending work in process 9,000 units, 80% complete. The cost per equivalent unit for material was $1.00 and for conversion costs $3.00.
- The number of units in abnormal spoilage was
- 500
- 50
- –0-
- 550
- The number of equivalent units of conversion costs was
- 17,200
- 19,700
- 20,000
- 17,900
- The cost of abnormal spoilage was
- $200
- $1,550
- $155
- $2,000
- The cost of goods completed was
- $41,550
- $40,000
- $40,816
- $41,053
- The cost of ending work in process was
- $31,995
- $30,600
- $31,334
- $31,547
- The total costs in work in process during the period were
- $31,995
- $70,600
- $73,700
- Cannot be determined
Use the following information for the next 5 questions.
Macey Company uses a weighted-average process costing system. Beginning inventory consists of 6,000 units, 40% complete. Units started are 14,000, completed are 10,000, and ending inventories are 9,000 units, 70% complete. Normal spoilage is 5% of the units inspected. Direct material is added at the 75% point and spoilage inspection occurs at the 80% point. The cost per equivalent unit for materials was $1.00 and $3.00 for conversion costs.
- The number of equivalent units of material was
- a. 20,000
- 18,000
- 18,200
- 11,000
- The loss from abnormal spoilage was
- $1,530
- $1,800
- $1,440
- $1,080
- The cost of the units completed was
- $40,000
- $42,200
- $41,760
- $41,870
- The cost of the ending work in process was
- $30,600
- $18,900
- $28,800
- $36,000
- Assume actual spoilage was 500 units and ending work in process was 9,500 units. The equivalent units of conversion costs would be
- 17,130
- 17,150
- 17,050
- 17,200
Use the following information for the next 4 questions.
Beginning work in process consists of 7,000 units, 55% complete. 50,000 units were started and ending work in process is 5,000 units, 25% complete. Normal spoilage is equal to 10% of the units inspected. The inspection point occurs at the 20% point and 7,000 units were rejected. Direct materials are added at the 50% point, direct labor at 30% and overhead is applied uniformly. The costs per equivalent unit are: direct material $1.00; direct labor $1.50; overhead $2.00.
- The equivalent units of labor are
- 48,000
- 45,000
- 46,000
- 46,500
- The cost of abnormal spoilage is
- $800
- $1,400
- $1,800
- $4,000
- The cost of the ending work in process is
- $2,500
- $2,850
- $2,700
- $4,000
- The number of units completed is
- 45,000
- 47,000
- 50,000
- 57,000
Use the following information for the next 4 questions.
Kelly, Inc. uses a weighted-average process costing system that calculates normal rework as 2% of the units passing inspection. The inspection point is at the 75% point and units failing inspection are returned to the 40% point. During the current period, 50,000 units were started; 62,000 units inspected; and 52,000 units completed. Direct material is added at the 50% point and conversion costs occur uniformly. Beginning work in process was 10,000 units, 55% complete and ending work in process was 8,000 units, 85% complete. Costs per equivalent unit for material were $1.00 and $3.00 for conversion costs.
- The number of units reworked was
- 3,000
- 2,000
- 8,000
- 10,000
- The loss from abnormal rework was
- $3,200
- $1,640
- $1,120
- $4,018
- The cost of the goods completed was
- $210,132
- $208,000
- $210,460
- $208,328
- The cost of the ending work in process was
- $28,400
- $30,532
- $32,328
- $28,728
- Normal spoilage is
- Considered to be a cost of the good units produced
- Recorded to a special loss account
- Treated as a current period expense
- Allocated to beginning work in process when it comes after the inspection point
- Normal spoilage can be defined as
- Controllable spoilage
- Spoilage that results from inefficient operations
- A percentage of the units surviving inspection
- A loss in the period in which it occurred
- Abnormal spoilage is
- The units that exceed the predetermined normal spoilage
- A cost of production allocated to the units surviving inspection
- Uncontrollable spoilage
- Spoilage attributable to efficient operations
Multiple Choice from Study Guide
s72. Process costing is most likely to be used by which of the following companies?
- Construction company that builds custom homes
- Shipyard
- Manufacturer of metal folding chairs
- Producer of special order furniture
s73. Equivalent units of production are the
- Number of units a company produced during a specified time period
- Number of units a company worked on during a specified time period
- Same as the number of units started and completed during a specified time period
- Number of whole units a company could have produced during a specified time period if it would have produced only whole units
s74. The difference between the weighted average and FIFO methods of computing equivalent units of production is the manner in which the
- Equivalent units for beginning inventory is computed
- Number of units started and completed is computed
- Equivalent units for ending inventory is computed
- Number of units completed and transferred out is computed
s75. Which of the following statements about the weighted average and FIFO methods is true?
- Equivalent units of production cannot be the same under the two methods.
- Equivalent units of production under FIFO are always greater than or equal to equivalent units of production under the weighted average method.
- Equivalent units of production under FIFO will equal equivalent units of production under the weighted average method only when there are no units in ending inventory.
- Equivalent units of production for ending inventory units are the same under the two methods.
s76. Suppose that a company adds material at the beginning of production and that conversion costs are incurred evenly throughout production. In May, the beginning work in process inventory was 20% complete and the ending work in process inventory was 30% complete. Under the FIFO method, the number of equivalent units of production for direct materials for May is equal to the number of units
- Started in May
- Started and completed in May plus 30% times the number of units in ending inventory for May
- Started and completed in May plus 20% times the number of units in beginning inventory plus 30% times the number of units in ending inventory for May
- Started and completed in May plus 80% times the number of units in beginning inventory plus 30% times the number of units in ending inventory for May
s77. Suppose that a company adds material at the beginning of production and that conversion costs are incurred evenly throughout production. In May, the beginning work in process inventory was 20% complete and the ending work in process inventory was 30% complete. Under the weighted average method, the number of equivalent units of production for direct materials for May is equal to the number of units
- Started in May plus the number of units in beginning inventory for May
- Started and completed in May plus 30% times the number of units in ending inventory for May
- Started and completed in May plus 20% times the number of units in beginning inventory plus 30% times the number of units in ending inventory for May
- Started and completed in May plus 80% times the number of units in beginning inventory plus 30% times the number of units in ending inventory for May
s78. Suppose that a company adds material at the beginning of production and that conversion costs are incurred evenly throughout production. In May, the beginning work in process inventory was 20% complete and the ending work in process inventory was 30% complete. Under the FIFO method, the number of equivalent units of production for conversion costs for May is equal to the number of units
- Started in May
- Started and completed in May plus 30% times the number of units in ending inventory for May
- Started and completed in May plus 20% times the number of units in beginning inventory plus 30% times the number of units in ending inventory for May
- Started and completed in May plus 80% times the number of units in beginning inventory plus 30% times the number of units in ending inventory for May
s79. Suppose that a company adds material at the beginning of production and that conversion costs are incurred evenly throughout production. In May, the beginning work in process inventory was 20% complete and the ending work in process inventory was 30% complete. Under the weighted average method, the number of equivalent units of production for conversion costs for May is equal to the number of units
- Completed in May plus 30% times the number of units in ending inventory for May
- Started and completed in May plus 30% times the number of units in ending inventory for May
- Started and completed in May plus 20% times the number of units in beginning inventory plus 30% times the number of units in ending inventory for May
- Started and completed in May plus 80% times the number of units in beginning inventory plus 30% times the number of units in ending inventory for May
s80. When will the weighted average and FIFO methods compute the same dollar amount for the costs to be transferred to the next department?
- When there are no units in ending inventory
- When there are no units in beginning inventory
- When the number of units in beginning inventory equals the number of units in ending inventory
- When beginning and ending inventory were at the same stage of completion
s81. Which of the following is the correct journal entry to transfer costs out of the Finishing Department, which is the last processing department?
- Debit Work in Process Inventory – Finishing Department and credit Finished Goods Inventory
- Debit Cost of Goods Sold and credit Finished Goods Inventory
- Debit Cost of Goods Sold and credit Work in Process Inventory – Finishing Department
- Debit Finished Goods Inventory and credit Work in Process Inventory – Finishing Department
s82. Under the weighted average method of process costing, the costs attached to the units in beginning work in process inventory are
- Not included in the computation of cost per equivalent unit
- Handled the same way as they are in FIFO process costing
- Included with the current costs when cost per equivalent unit is calculated
- Included with the costs attached to the units in ending work in process inventory
s83. Which of the following statements is false?
- Under the FIFO method, beginning inventory costs are kept separate from the current period’s costs
- Under the weighted average method, beginning inventory costs are combined with the current period’s costs
- The weighted average and FIFO methods will assign the same amount of costs to the ending inventory units under a standard costing system
- The weighted average method is superior to the FIFO method for the purposes of controlling costs
s84. Sundae’s Sundries uses the weighted average method of process costing. The company’s ending work in process inventory consisted of 8,000 units that were 80% complete. Materials are added at the beginning of processing. The direct materials cost per equivalent unit was $3.20, and the conversion cost per equivalent unit was $1.80. What is the amount of cost Sundae would assign to ending work in process inventory?
- $28,480
- $37,120
- $32,000
- $40,000
s85. Mikey’s Mugs uses the FIFO method of process costing. The company’s ending work in process inventory consisted of 12,000 units that were 40% complete and had incurred 80% of the materials costs. The direct materials cost per equivalent unit was $2.40, and the conversion cost per equivalent unit was $3.30. What is the amount of cost Mikey would assign to ending work in process inventory?
- $27,360
- $38,880
- $46,800
- $68,400
s86. Schachte Corporation uses the weighted average method of process costing. The company had 7,000 units in ending work in process inventory, and it started 70,000 units this month. There were 12,000 units in beginning work in process inventory. If the total processing cost per equivalent unit is $3, what is the amount of cost transferred out of work in process this month?
- $189,000
- $210,000
- $225,000
- $231,000
s87. Which of the following statements is true?
- Transferred-in costs are the materials costs from the prior department.
- Transferred-in costs are the costs from all prior departments.
- Transferred-in costs are the costs from the prior period.
- All transferred-in costs will be assigned to the units completed and transferred out during the period.
s88. Maka Manufacturing uses the weighted average method of process costing. You are given the following information for Department 2 for February:
Units Percent Complete
Beginning work in process inventory 2,200 30%
Transferred in from the prior
department during February 70,000 –
Ending work in process inventory 4,500 20%
Suppose the conversion cost per equivalent unit is $2.10. How much conversion costs were transferred to the next department during February?
- $137,550
- $142,170
- $147,000
- $151,620
s89. Normal spoilage is
- Unacceptable units of production that occur because of an unexpected event
- Spoilage that exceeds expectations
- Unacceptable units of production that occur because of poor quality inputs
- Unacceptable units of production that are considered part of normal manufacturing operations
s90. Abnormal spoilage is
- Debited to Cost of Goods Sold
- Spoilage that exceeds expectations
- Considered a product cost
- Unacceptable units of production that are considered part of normal manufacturing operations
s91. The costs of normal spoilage
- Are debited to a loss account
- Are included with the costs of the good units transferred out
- Decrease the per unit processing cost for the good units transferred out
- Do not affect the per unit processing cost for the good units transferred out
s92. The costs of abnormal spoilage
- Are debited to a Finished Goods Inventory
- Are included with the costs of the good units transferred out
- Decrease the per unit processing cost for the good units transferred out
- Do not affect the per unit processing cost for the good units transferred out
s93. You are given the following information for Joseph Manufacturing:
Beginning inventory units 1,000
Ending inventory units 5,000
Units started 24,000
Good units completed 17,000
Suppose that a 4% defect rate (based on the number of good units completed) is considered normal. Compute the number of units of normal spoilage and the number of units of abnormal spoilage, respectively, assuming that the inspection for spoiled units occurs at the end of processing.
- 960 and 2,040
- 800 and 2,200
- 1,160and 1,840
- 680 and 2,320
Use the following information for the next 5 questions.
You are given the following information for the SJK Company for January:
Beginning inventory units 2,000
Ending inventory units 1,000
Units started 28,000
Good units completed 27,000
The total processing cost per equivalent unit was $15 in January. SJK considers spoilage equal to 5% of the good units transferred out to finished goods to be normal. SJK uses the weighted average method of process costing for its sole production department, and inspection for spoiled units occurs at the end of processing.
s94. The costs attached to normal spoilage total
- $35,250
- $30,000
- $20,250
- $9,750
s95. The costs attached to abnormal spoilage total
- $35,250
- $30,000
- $20,250
- $9,750
s96. The costs attached to good units completed and transferred out total
- $375,000
- $405,000
- $425,250
- $435,000
s97. The per unit cost of the good units transferred out equals
- $13.89
- $15.00
- $15.75
- $16.11
s98. The entry to transfer costs out of work in process and into finished goods and a loss from abnormal spoilage account includes a credit to Work in Process Inventory for
- $384,750
- $414,750
- $425,250
- $435,000
s99. In April, the beginning work in process inventory for Department 2 was 40% complete and the ending work in process inventory was 90% complete. Under the FIFO method, the number of equivalent units of production for transferred-in costs for April is equal to the number of units
- Started and completed in April plus 90% times the number of units in ending inventory for April
- Started and completed in April plus 40% times the number of units in beginning inventory plus 90% times the number of units in ending inventory for April
- Started and completed in April plus 40% times the number of units in beginning inventory plus 90% times the number of units in ending inventory for April
- Started in April
s100. In April, the beginning work in process inventory for Department 2 was 40% complete and the ending work in process inventory was 90% complete. Under the weighted average method, the number of equivalent units of production for transferred-in costs for April is equal to the number of units
- Started and completed in April plus 90% times the number of units in ending inventory for April
- Started and completed in April plus 40% times the number of units in beginning inventory plus 90% times the number of units in ending inventory for April
- Started and completed in April plus 40% times the number of units in beginning inventory plus 90% times the number of units in ending inventory for April
- Started in April plus the number of units in beginning inventory for April
Multiple Choice from Web Quizzes (Available on Student Web Site)
w101. Process costing is used to account for costs in
- Custom manufacturing
- Services such as health care
- Mass production
- None of the above
w102. Equivalent units reflect
- All of the units produced in a period
- The amount of work that could have been completed if all effort had gone to complete whole units instead of partially completed units
- Only the units that are partially complete at the end of the period
- Only the units that are partially complete at the beginning of the period
w103. Direct materials are allocated
- Very often at the beginning of the manufacturing process
- Uniformly throughout the manufacturing process
III. At a different rate than conversion costs and, therefore, need to be valued separately for ending inventories
- I only
- I and III only
- I, II, and III
- I and II only
w104. Conversion costs
- Are not used in process costing
- Are often incurred unevenly, but are allocated evenly throughout the production process
- Include the cost of direct materials
- Are usually incurred and allocated evenly throughout the production process
w105. Direct materials are added at the beginning of the process. There are 10,000 units in ending WIP inventory that are 75% complete with regard to conversion costs. The equivalent units in ending WIP are:
Direct Materials Conversion Costs
- 10,000 7,500
- 7,500 7,500
- 10,000 10,000
- 7,500 10,000
w106. Under mass production, at the end of the period
- The production line is stopped so that all units are completed to reduce accounting problems
- Some units will be partially complete, and conversion costs and direct material costs need to be assigned to them
- The books cannot be closed because the production never stops
- All of the units that are not complete are counted as 100% complete to reduce bookkeeping problems
w107. Direct materials are added at the beginning of the process. This period began with 5,000 units in beginning inventory that are 25% complete. What are the equivalent units for beginning work in process under the FIFO method?
Direct Materials Conversion Costs
- 5,000 1,250
- 5,000 3,750
- 0 1,250
- 0 3,750
w108. Process costing
- Is used for assigning costs in mass production
- Can only be used in manufacturing
III. Can be used in some service industries
- I only
- I and II only
- I and III only
- I, II, and III
w109. The weighted average method
- Considers only this period’s costs and work
- Includes beginning WIP costs in the equivalent unit cost calculations
- Uses standard costs to allocate cost to units
- Excludes ending WIP units and costs
w110. Normal spoilage includes
- Spoilage that arises because operations are out of control
- Spoilage that arises as a regular part of ordinary production
- Spoilage that arises when external events cause a lot of units to be spoiled
- Reworked units
w111. Once the physical units have been summarized
- Costs are allocated to all of the work done this period
- The cost report is complete
- Equivalent units need to be summarized
- Costs are allocated only to ending WIP inventories
w112. The cost of transferred-in units is accounted for by
- Ignoring it
- Adding it to beginning WIP and work performed this period as an additional cost with a separate category
- Adding it to direct materials and allocating it with the direct materials
- Adding it to conversion costs and allocating it with conversion costs
w113. Once equivalent unit costs have been developed
- Information is gathered about production
- Costs are allocated to all units transferred out and in ending WIP
- The equivalent units and equivalent unit costs are calculated
- The physical units and total costs are summarized
w114. The following method(s) best reflects current period costs
- Weighted average method
- FIFO method
III. Standard cost method
- I only
- II only
- I and III only
- II and III only
w115. Beginning WIP units were 8,000, and 40,000 units were transferred out this period. Ending WIP is 4,000 units. What is the number of units started and completed this period?
- 48,000
- 40,000
- 32,000
- 28,000
Use the following information for the next 5 questions.
(CMA) The accountant for Whirly Manufacturing Inc. gathered the following information for the month of November.
Beginning WIP 16,000 units
Started in production 100,000
Completed production 92,000
Ending WIP 24,000
The beginning inventory was 60% complete for materials and 20% complete for conversion costs. The ending inventory was 90% complete for materials and 40% complete for conversion costs.
Costs pertaining to the month of November are as follows:
Beginning inventory costs are:
Materials $54,560
Direct labor 20,320
Factory overhead 15,240
Costs incurred during November include:
Materials $468,000
Direct labor 182,880
Factory overhead 391,160
w116. Using the first-in, first-out (FIFO) method, the equivalent units of production for materials are
- 97,600 units
- 104,000 units
- 107,200 units
- 113,600 units
w117. Using the FIFO method, the equivalent units of production for conversion costs are
- 85,600 units
- 95,200 units
- 98,400 units
- 101,600 units
w118. Using the FIFO method, the equivalent unit cost of materials for November is
- $4.12
- $4.50
- $4.60
- $4.80
w119. Using the FIFO method, the equivalent unit conversion cost for November is
- $5.65
- $5.83
- $6.00
- $6.20
w120. Using the FIFO method, the total cost of units in the ending work in process inventory on November 30 is
- $153,168
- $154,800
- $155,328
- $156,960
Matching
- Several terms related to alternative systems for mass production are listed below on the right, and definitions are listed on the left. Match each term with the definition that best describes it. Each numbered item has only one correct answer. Each lettered item may be used once, more than once, or not at all.
____ 1. Units in each batch are identical and each batch goes through the same production process
____ 2. Track costs using work orders for batches of products
____ 3. Simplifies process costing because inventories are minimized
____ 4. Provide a comparison benchmark for actual costs
____ 5. Production costs managers expect to incur under operating plan assumptions
____ 6. Process costing is used to the point of customization
____ 7. Inventory units are received and delivered just as needed, so there is very little beginning or ending inventory
____ 8. Direct costs are traced to each job as the job is customized
____ 9. Can lead to long-term price stability for direct materials
____ 10. Allocated to units in a manner similar to FIFO process costing | A. Hybrid costing
B. Just In Time
C. Operation costing
D. Procurement contracts
E. Standard costs
F. None of the above |
Exercises
- Following are production data for a process costing system.
Beginning work in process, 30% complete 12,000 units
Started 90,000 units
Ending work in process, 70% complete 8,000 units
Costs:
Beginning work in process:
Direct Materials $ 28,800
Conversion costs 5,220
Materials used during the period 216,000
Conversion costs incurred during the period 139,200
- Using the FIFO basis, prepare a process costing report.
- Write out the journal entries for the costs incurred and the work performed this period under the FIFO method.
- Following are production data for a process costing system.
Beginning work in process, 30% complete 12,000 units
Started 90,000 units
Ending work in process, 70% complete 8,000 units
Costs:
Beginning work in process:
Direct Materials $ 28,800
Conversion costs 5,220
Materials used during the period 216,000
Conversion costs incurred during the period 139,200
- Using the weighted average, prepare a process costing report.
- Write out the journal entries for the costs incurred and the work performed this period under the weighted average method.
- Mojdehi Manufacturing Co. uses a weighted average process costing system. During the current period 4,800 units were transferred in (cost $150,000) to Department Q. In Department Q materials were added costing $20,000 and conversion costs of $55,000 were incurred. A total of 4,400 good units were transferred to finished goods. Normal spoilage is 2% of the units inspected, and the inspection occurs at the end of the process. Direct materials are added at the beginning of the process. Additionally:
Beginning WIP: 1,000 units, 40% complete
Direct materials costs = $4,070
Conversion costs = $6,008
Transferred-in costs = $10,080
Ending WIP: 1,200 units, 30% complete
Prepare a complete process costing report for the current period.
- At the beginning of August 20×1, CHN Corporation had 100 units in beginning work in process, which were 100% complete with respect to materials and 20% complete with respect to conversion. CHN started 500 units during August. Ending work in process consisted of 50 units, which were 100% complete with respect to materials and 60% complete with respect to conversion.
- Calculate CHN’s equivalent units for August using the FIFO method.
- Calculate CHN’s equivalent units for August using the weighted average method.
- Felix and Sons produce a small plastic toy called the Monster Car. Materials are added at the beginning of the process in the plastic forming process. Conversion was 75% complete for the 8,000 units in work in process on February 1 and 50% complete for the 6,000 units in work in process on February 29. During February 12,000 Monster Cars were started and completed with respect to the forming department and transferred to the next department. There was no spoilage over the period. Here is an analysis of the costs for the period:
Direct Materials Conversion Costs
Work in process, July 1 $ 9,900 $ 3,600
Costs added in July 15,600 10,800
$25,500 $14,400
Using the weighted average method, prepare a schedule to show the calculation of the total cost per equivalent unit for February. That is, calculate the equivalent unit cost for direct materials and for conversion costs and then sum them.
- DPH Corporation is in the chemical manufacturing business. Products go through two production departments (A first, then B). Data from those departments for November 20×1 are presented below.
| Department A |
| Beginning
work in process | Ending
work in process |
Number of units | 500 | 300 |
% complete for materials | 100% | 100% |
% complete for conversion | 60% | 30% |
Total materials cost | $12,000 | |
Total conversion cost | $15,000 | |
| Department B |
| Beginning
work in process | Ending
work in process |
Number of units | 100 | 150 |
% complete for materials | 100% | 100% |
% complete for conversion | 30% | 40% |
Total materials cost | -0- | |
Total conversion cost | $20,000 | |
Total transferred-in costs | 7,500 | |
DPH started 1,300 units of product during the month in Department A. Costs incurred in Department A for November 20×1 totaled $32,000 for material and $66,000 for conversion. Additionally, Department B incurred conversion costs in November 20×1 of $300,000. Department B adds no materials to the product.
- Prepare a production cost report for Department B for November 20×1. DPH accounts for its costs using the weighted-average method.
- Write out the journal entry for the transfer of goods from Department A to Department B.
- Sunflower Seed Producers manufactures cooking oil and other products made from sunflower seeds. All direct materials are added at the beginning of the production process. Data for the direct materials used in the manufacture of cooking oil for the month of December is listed below.
Production data:
Beginning work in process 25,000 units
Units started during the period 50,000 units
Completed and transferred out 67,500 units
Manufacturing costs:
Beginning work in process (direct materials) $35,000
Direct material used $75,000
- Under the FIFO method, how many units were started and completed with respect to direct materials during the month?
- Under the FIFO method, what is the cost of the direct materials in ending work in process at the end of the month?
- Under the FIFO method, what is the amount of direct materials cost transferred out this period?
- Calculate the direct materials cost per equivalent unit under the weighted average method.
- Did the purchase price of direct materials increase or decrease this period compared to last period? Explain.
More Difficult Exercises
These exercises require more complex computations or present information differently than in the textbook.
- WLS Corporation uses weighted-average process costing. Equivalent units of production for September 20×2 were 640 for materials and 615 for conversion. Other information for September follows:
- Beginning work in process totaled 200 units, 100% complete for direct materials and 80% complete for conversion costs
- 500 units were started during the month.
- Ending work in process consisted of 100 units.
- Calculate the number of units completed and transferred out for September 20×2.
- Calculate the percentage of completion for ending work in process.
- Indy, Inc. uses a process costing system. At the beginning of the month there were 7,000 units in process, 30% complete. During the month 90,000 units were transferred in and 86,000 were completed and transferred to finished goods. The ending work in process was 11,000 units, 60% complete.
Materials are added at the beginning of the process, and labor at the 50% point. Overhead costs are incurred uniformly. The cost of beginning work in process was $14,080 for materials, $3,272 for overhead, and $28,700 for transferred-in costs. Current costs are $193,500 for materials, $131,920 for labor, $220,820 for overhead, and $369,000 for transferred-in costs. Indy uses the FIFO method.
- Determine the cost of the goods completed and transferred out.
- Write out the journal entry to record the units transferred to finished goods.
- Determine the cost of the ending work in process.
- Indy, Inc. uses a process costing system. At the beginning of the month there were 7,000 units in process, 30% complete. During the month 90,000 units were transferred in and 86,000 were completed and transferred to finished goods. The ending work in process was 11,000 units, 60% complete.
Materials are added at the beginning of the process, and labor at the 50% point. Overhead costs are incurred uniformly. The cost of the beginning work in process was $14,080 for materials, $3,272 for overhead, and $28,700 for transferred-in costs. Current costs are $193,500 for materials, $131,920 for labor, $220,820 for overhead, and $369,000 for transferred-in costs. Indy uses the weighted average method.
- Determine the cost of the goods completed and transferred out.
- Write out the journal entry to record the units transferred to finished goods.
- Determine the cost of the ending work in process.
Short Answer
- Explain the differences between the weighted average and FIFO process costing methods.
- The manager in a plant that mass-produces computer components would like information about the most current costs because the cost of direct materials frequently changes. Provide a recommendation for a process costing method and give one reason for your recommendation.
- List three products that are mass produced and for which process costing would be appropriate.
- Explain why an organization might use both FIFO and standard costs in a process costing system.
- Describe normal spoilage in your own words and explain how it is recorded in a process costing system.
- Describe abnormal spoilage in your own words and explain how it is recorded in a process costing system.
- When normal spoilage levels are high, any excess spoilage is classified as abnormal spoilage and recorded as a loss for the period. Managers are likely to be held responsible for these losses. Explain why a manager might prefer to send more units to be reworked when spoilage levels increase.
- The accountant at DPL Company is thinking about dividing the process costing conversion costs into three separate cost pools: direct labor, variable overhead, and fixed overhead. Each cost pool would be allocated separately to equivalent units. Discuss whether this approach would improve the accuracy of costs assigned to each unit.
- List one cost and one benefit from moving inspection to an earlier position in the manufacturing process.
- List a potential business risk that occurs when spoilage rates increase dramatically.
- List one pro and one con that managers should identify when they consider the trade-offs between investing in quality improvements and incurring the costs of undetected spoiled units.
- Describe one factor that would affect an accountant’s choice of process costing method.
- List two reasons why actual costs are likely to be different from standard costs in a given period.
- Explain how normal spoilage costs are treated when goods are transferred to another department in a process costing system.
Problems
- OVT Corporation manufactures picture frames. Production takes place in three departments, described below:
Cutting: Machines cut 6-foot boards into 3-, 6- and 12-inch lengths.
Assembly: Individual pieces of wood are glued together in square and rectangular shapes.
Finishing: The picture frames are painted, lacquered, and dried. They are then packed into boxes of 100 frames each and shipped to retailers.
Inventory levels and costs at OVT are fairly constant, at the amounts shown in the following table:
Ending WIP Stage of Completion Department Cost
Inventory Direct Conversion Per Equivalent
(units) Materials Costs Unit
Cutting 150 100% 40% $1.15
Assembly 250 100% 30% 0.75
Finishing 200 100% 70% 2.10
Total cost per equivalent unit $4.00
Finished goods inventory (i.e., boxes of completed frames awaiting shipment) is typically around 300; each box of 100 frames has an approximate total cost of $450.
- Identify and describe two risks that OVT faces as a result of keeping 300 boxes of finished goods inventory on hand.
- Should Joanne expect the cost per equivalent unit in each department to be the same from month to month? If so, explain why. If not, identify two reasons why the cost of a picture frame might vary over time.
- Notice that the department cost per equivalent unit (excluding transferred-in costs) is lowest in the Assembly Department and highest in the Finishing Department. Recalling that the cost per equivalent unit is made up of direct material, direct labor, and overhead, suggest two reasons why the Assembly Department’s cost is lowest.
- OVT is considering implementing more automation in its production operation. For example, frames are currently painted and lacquered by hand in the Finishing Department. OVT’s president, Max Kinley, wants to replace most of the direct labor workers in the Finishing Department with painting and lacquering machines. Explain how the use of machines in place of direct labor workers would affect the direct labor cost and overhead cost per equivalent unit.
- OVT currently calculates the cost of picture frames using the weighted-average method. However, it could use the FIFO method. Explain the similarities and differences between the two methods. Discuss one pro and one con of using the weighted average method.
- Spoilage costs in OVT Corporation are normally minimal and are treated in the accounting information system as abnormal costs. How would OVT’s accountant record the cost of spoiled units? Explain the process. Describe why there is no single, correct way to account for the cost of spoiled units in a process costing system.
- Like most information in cost accounting, OVT’s costs are subject to some uncertainties. For example, estimating the percentage of completion for ending work in process involves some estimation and uncertainty. Identify and explain two additional uncertainties associated with using process costing to calculate the cost of a picture frame.
- Falcon Fabricating Company uses a process costing system. One of the employees is responsible for estimating the percentage completion; however, he has never had any formal training in making these estimates. He is wondering whether the accuracy of his estimates could be improved. A colleague in another department suggested that he consider using techniques such as timing one unit through each department and identifying points in the production process where units appear to be 25% complete, 50% complete, and so on.
- Discuss why the percent completion is not generally known with absolute accuracy.
- Comment on whether the suggested method is likely to provide an accurate estimate of work in process.
- List one advantage of improving the accuracy of the estimate. What might be a disadvantage?
- Mountain Meadow Grains produces trail mix. Materials are added at the beginning of the process, and the company uses the FIFO process costing method. Inspection takes place when the product is 100% complete. Normal spoilage is 4% of good units completed. Here is the production information for the latest period.
Beginning WIP (75% complete) 20,000 units
Good units completed and transferred out 80,000 units
Ending WIP inventory (90% complete) 24,000 units
Total spoilage 4,800 units
FIFO cost per equivalent unit:
Materials $1.00
Conversion costs 1.50
Total unit cost $2.50
Cost of Beginning WIP $50,000
- Calculate the cost of abnormal spoilage.
- Calculate the cost of good units completed and transferred, including an allocation of normal spoilage costs.
- The costs recorded in the accounting system for spoilage include direct materials and conversion costs up to the point of completion. However, these recorded costs are only part of the costs incurred when spoilage occurs. Write a brief paragraph that discusses other costs of spoilage that are not recorded in the accounting system and explain why they might be more important to an organization than the costs in the accounting system.
- Discuss why uncertainties exist about how much spoilage is normal versus abnormal.
- Johnson and Heffner make janitorial supplies and has a department that produces cleaning brushes. All direct materials are added at the beginning of production, and conversion costs are incurred evenly throughout production. The 2,000 units in Beginning WIP on December 1 were 80% complete, and the 4,000 units in Ending WIP on December 31 were 25% complete. During the month, 16,000 units of cleaning brushes were completed and transferred out as finished goods.
Using this information and the cost information provided below, fill in the blanks in the following FIFO process costing report by calculating the amounts for items A-X. Round total costs to the nearest dollar and per-unit costs to the nearest cent.
1. Summarize Total Costs to Account For |
| Direct Materials | Conversion Costs | Total Costs |
Beginning WIP | $ 4,000 | A | $ 8,800 |
Current period costs | B | 46,200 | 82,200 |
Total costs to account for | C | D | E |
2. Summarize Physical and Equivalent Units |
| Beginning WIP
80% | Work Performed This Period | Total Units to Account for |
Complete Beg. WIP
20% | Start and
Complete | Start Ending WIP
25% | Total Work Performed This Period |
Physical Units | 2,000 | 0 | F | 4,000 | 18,000 | G |
| | | | | | |
Equivalent Units: | | | | | | |
Direct Materials | 2,000 | H | 14,000 | J | 18,000 | L |
Conversion Costs | 1,600 | I | 14,000 | K | 15,400 | M |
3. Calculate Cost Per Equivalent Unit |
Direct Materials | N |
Conversion Costs | O |
Total Cost Per Equivalent Unit | $5.0000 |
(continued on next page)
4. FIFO Process Cost Report |
| Units | Total |
Beginning WIP | 2,000 | $8,800 |
Costs to complete beginning WIP | | P |
| | |
Total cost of beginning WIP transferred out | 2,000 | Q |
| | |
Units started, completed, and transferred out | R | S |
| | |
Total units completed and transferred out | T | U |
| | |
Ending WIP: | 4,000 | |
Direct materials | | V |
Conversion costs | | W |
Total ending WIP cost | | X |
| | |
Total Units Accounted For | 20,000 | |
Total Costs Accounted For | | $91,000 |
- Kovacik Products uses a FIFO process costing system to accumulate product costs. The Fabricating Process center is the first center, where production of bronze lamps begins. Direct materials are used in the beginning of the process. November’s information follows:
Beginning work in process (75% complete) 16,000 units
Started in November 117,500 units
Ending work in process (40% complete) 17,500 units
Costs for November were:
Beginning inventory $24,000 Direct materials
6,000 Direct labor
12,000 Overhead
Current costs added: $204,800 Direct materials
72,150 Direct labor
127,650 Allocated overhead
- Calculate the equivalent units and cost per unit of direct material and conversion using the FIFO method.
- The manager estimating completion believes that she may have underestimated the percentage of completion for ending inventory. Explain how this will affect the cost per equivalent unit this period and next period.
- Next period volumes of production are expected to increase and because of volume discounts, direct materials costs are expected to decrease. At the end of next period, would weighted average or FIFO show a lower cost per unit? Explain.
Answers
True / False
- T
- T
- F
- F
- F
- T
- T
- T
- F
- F
- T
- F
- T
- T
- F
- F
- T
- F
- F
- T
- T
- T
Multiple Choice
- C; 600 + 6,000 – 400
- B; 13,000 + 1,000
- C; 15,000 + 1,000
- D; 15,000 + 1,000(0.6)
- A; equiv unit cost = $31,500/10,500
- B; TC = $1,250 + $31,500 = $32,750; units = 500 + 10,500 = 11,000
- C; 15,000 – 1,500 = 13,500
- A; 750(0.4) + 13,500 + 1,500(0.4)
- D; $150,000 / 15,000
- B; # units completed = 14,250 = 750 in beg WIP + 13,500 start & compl; cost per equiv unit = $83,520 / {750(0.4) + 13,500 + 1,500(0.4)} = $5.80; beg WIP = $5,925 + $4,095 + $5.80(750)(0.4) = $184,020; start & compl cost = 13,500 * $15.80 = $213,300
- A; 750 + 15,000
- B; units = 750 + 13,000 + 1,500(0.4) = 14,850; cost = $83,520 + $4,095 = $87,615
- A; units = 15,750 – 1,500 = 14,250; CC per equiv unit = $5.90; DM per equiv unit = ($5,925 + $150,000) / 15,750 = $9.90
- D; (1,500 * $9.90) + (1,500 * 0.4 * $5.90)
- A; 20 + 160 = 170 + end WIP à end WIP = 10; wtd avg = 170 + 10 = 180; FIFO = 150 + 10 = 160
- A; 20,000 * $4.00 – $61,500
- C; 6,000(0.4) + 14,000 + 3,200
- B; 20,000 – 6,000 + 3,200 / 0.4
- C; 1,200 – 350
- A; 850 + 350
- B; $38,040 / 1,200
- C; $17,013 / {250(0.6) + 350(0.2) + 850) = $15.90; $1,250 + $1,356 + $2,560 + 250(0.6)($15.90) = $7,551
- D; 350 * ($6,000 / 1,200 + $38,040 / 1,200) = $12,845; 350 * 20% * $15.90 = $1,113; $12,845 + $1,113 = $13,958
- C; 1,200 + 250 – 350 = 1,100; 350 * 20% = 70; 1,100 + 70 = 1,170
- B; $38,040 + $2,560
- A; ($1,250 + $6,000) / (1,100 + 350)
- A; ($1,356 + $17,013) / 1,170 = $15.70; ($38,040 + $2,560) / (1,200 + 250) = $28.00; 1,100 * ($5.00 + $15.70 + $28.00) = $53,570
- D; (350 * $33) + (350 * 20% * $15.70) = $12,649
- C; materials: 20 + 90 = 110; trans = 20 + 90 = 110; conv = 100 + 10(0.5) = 105
- A; trans = 90; materials = 90; conv = 80 + 10(0.5) + 20(0.6) = 97
- C
- A
- B
- B
- A
- B
- B
- C
- A
- C
- C
- D; {(11,000)($20) + (11,000 * .15 * $20)} / 11,000
- A; trans = 90; materials = 90; conv = 80 + 10(0.5) + 20(0.6) = 97
- C; 6000(0.4) + 14,000 + 3,200
- B; 20,000 – 6,000 + 3,200 / 0.4
- C; $122,100 / $5.50 = 22,200 equiv units; 22,200 = 2,000(0.6) + 15,000 + 0.8(n)
- B; $91,650 – {(15,000 + 2,000(0.6)) ($5.50)}
- D; DM equiv units = 14,000 = -0- from beg WIP + 14,000 start & compl + -0- from end WIP; CC equiv units = 18,000 = 1,000(0.7) from beg WIP + 14,000 start & compl + n(0.15) from end WIP
- C; 14,000 + 22,000
- B; total spoilage = 14,000 + 6,000 – 10,000 – 9,000 = 1,000; normal = 19,000 * 5% = 950; abnormal = 1,000 – 950 = 50
- D; 10,000 + 9,000(0.8) + 1,000(0.7)
- C; (50 * 1.00) + (50 * 70% * $3.00)
- A; (10,000 * $4.00) + 10 / 19 {(950 * $1.00) + (950 * 70% * $3.00)}
- A; (9,000 * $1.00) + (9,000 * 80% * $3.00) + 9 / 19 {(950 * $1.00) + (950 * 70% * $3.00)}
- C; (10,000 * $4) + (9,000 * 80% * $3) + (9,000 * $1) + (1,000 * $1) + (1,000 * 70% * $3)
- D; total spoilage = 6,000 + 14,000 – 10,000 – 9,000 = 1,000; 10,000 + 1,000 = 11,000
- A; units inspected = 10,000 + 1,000 = 11,000; normal spoilage = 5% * 11,000 = 550; abnormal = 1,000 – 550 = 450 units; (450 * $1.00) + (450 * 80% * $3.00) = $1,530
- D; 10,000 * $4 + 550 * $1 + 550 * 80% * $3
- B; 9,000 * $3 * 70%
- C; 9,500 * 70% + 10,000 + 500 * 80%
- B; spoilage is removed before labor is added, so only good units incur labor costs.
Good units start & compl = 7,000 + 50,000 – 7,000 – 5,000 = 45,000
- A; units inspected = 50,000; normal spoilage = 5,000; abnormal spoilage = 2,000; cost = 2,000 * 20% * $2
- C; (5,000 * 25% * $2) + (5,000 / 50,000 * 5,000 * 20% * $2)
- A; 52,000 – 7,000
- B; # passing inspection = 52,000 + 8,000 = 60,000; # inspected = 62,000; # reworked = 2,000
- B; normal rework = 60,000 * 2% = 1,200 units; abnormal = 2,000 – 1,200 = 800; cost of abnormal rework = (800 * $1) + (800 * 35% * $3)
- A; 52,000 * $4 + 52 / 60 {(1,200 * $1) + (1,200 * 35% * $3)}
- D; 8,000 * $1 = $8,000; 8,000 * 85% * $3 = $20,400; 8 / 60 {(1,200 * $1) + (1,200 * 35% * $3)} = $328; $8,000 + $20,400 + $328 = $28,728
- A
- B
- A
s72. C
s73. D
s74. A
s75. D
s76. A
s77. A
s78. D
s79. A
s80. B
s81. D
s82. C
s83. D
s84. B; DM = 8,000 x $3.20 = $25,600; CC = 6,400 x $1.80 = $11,520; $25,600 + $11,520 = $37,120
s85. B; DM: (80% x 12,000) x $2.40 = $23,040; CC: (40% x 12,000) x $3.30 = $15,840; $23,040 + $15,840 = $38,880
s86. C; Using t-account # units trans out = 75,000 units; 75,000 x $3 = $225,000
s87. B
s88. B; Using t-account # units trans out = 67,700 units; 67,700 x $2.10 = $142,170
s89. D
s90. B
s91. B
s92. D
s93. D; Using t-account # spoiled units = 3,000; Normal=17,000×4%=680; Abnormal=3,000-680=2,320
s94. C; using 5-account # spoiled units = 2,000; Normal=27,000×5%=1,350; Abnormal=3,000-1,350=650; $15 x 1,350 = $20,250
s95. D; $15 x 650 = $9,750
s96. C; $15 x 27,000 + $20,250 = $425,250.
s97. C; $425,250/27,000 = $15.75
s98. D; Debit FG Inventory $425,250; Debit Loss from Ab. Spoilage $9,750; Credit WIP $435,000
s99. D
s100. D
w101. C
w102. B
w103. D
w104. B
w105. A
w106. B
w107. D
w108. C
w109. B
w110. B
w111. C
w112. B
w113. B
w114. B
w115. C
w116. B
w117. C
w118. B
w119. B
w120. A
Matching
1.
- F
- C
- B
- E
- E
- A
- B
- F
- D
- E
Exercises
1 and 2 share the following computations:
- a.
- Journal entries:
Work in process inventory $216,000
Raw material inventory $216,000
Work in process inventory $139,200
A/P, Wages Payable, etc. $139,200
Finished goods inventory $368,500
Work in process inventory $368,500
- a.
- Journal entries:
Work in process inventory $216,000
Raw material inventory $216,000
Work in process inventory $139,200
A/P, Wages Payable, etc. $139,200
Finished goods inventory $367,336
Work in process inventory $367,336
- a. Equivalent units for materials = 0 + 500 = 500
Equivalent units for conversion = (100 * 80%) + 450 + (50 * 60%) = 560
- Equivalent units for materials = 100 + 500 = 600
Equivalent units for conversion = 550 + (50 * 60%) = 580
- Equivalent units for direct materials = 8,000 + 12,000 + 8,000 = 26,000
Equivalent unit cost = ($25,500)/4,000 = $25,500/26,000 = $0.981
Equivalent units for conversion = 8,000 + (6,000 x 0.50) + 12,000 = 23,000
Equivalent unit cost = ($3,600 + $10,800)/23,000 = $0.626
Total equivalent unit cost = $1.607.
- a.
- b. Journal entry:
Work in process inventory – Dept. B $113,082
Work in process inventory – Dept. A $113,082
- a. Units in ending WIP = 7,500 (25,000 + 50,000 – 67,500)
Units started and completed = 50,000 – 7,500 = 42,500
- FIFO equivalent unit cost = $75,000/50,000 = $1.50, ending WIP = 7,500 x $1.50 = $11,250
- Cost of units transferred out = $35,000 + (42,500 * $1.50) = $98,750
- Equivalent unit cost under weighted average = $110,000/75,000 = $1.47
- Costs increased from last period compared to this period because FIFO costs are current period costs and the equivalent unit cost was $1.50, whereas the weighted average costs include last period’s costs and the equivalent unit cost was $1.47, which is lower than the FIFO cost. Therefore costs increased.
- a. 200 + 500 – 100 = 600
- Materials: 640 = 600 started & completed + 100 (% complete) à % complete = 40
Conversion: 615 = 600 started & completed + 100 (% complete) à % complete = 15
- a.
- Journal entry:
Finished goods inventory $861,478
Work in process inventory $861,478
- a. 86,000 * $10.02 = $861,720
- Journal entry:
Finished goods inventory $861,720
Work in process inventory $861,720
- 11,000*($10.02-$2.42) + 11,000*0.6*$2.42 = $99,572
Short Answer
- The weighted average method combines work and costs from the prior period by adding beginning WIP to its calculations. FIFO ignores work and costs from last period in developing this period’s cost per unit, and then adds last period’s work in the process cost report to reflect the cost of beginning inventories transferred out.
- The FIFO method tracks the most current costs, so it would be the best method under this circumstance.
- Three products that would use process costing include many types of food such as soda or breakfast cereals, containers such as soda cans or plastic bottles, pharmaceuticals, toys, etc. Students may have a variety of answers.
- Standard costs are used as benchmarks for current period results. FIFO most accurately reflects the current period costs, so it is the best measure for comparing to a standard cost benchmark. This allows managers to determine whether costs are in control so that they can take action if needed.
- Normal spoilage arises as part of regular operations and is considered unavoidable. It is recorded as part of the cost of units produced and transferred out.
- Abnormal spoilage arises from out-of-control operations or some event that is unusual that spoils units, such as a natural disaster – flood, earthquake, and so on. It is recorded as a loss for the period.
- Managers may not want to be held responsible for high levels of spoilage, and so they will send spoiled units to be reworked. Abnormal spoilage is recorded in a separate loss account and visible to higher levels of management. As abnormal spoilage amounts increase, managers may begin to worry about their reputation with upper levels of management. By sending units for rework, the manager avoids any attention being drawn to operations that are not in control.
- Whether the proposed approach would improve the accuracy of costs assigned to each unit depends on how the various types of conversion costs are incurred in the production process. Combining all conversion costs into a single cost pool makes the assumption that direct labor, variable overhead, and fixed overhead are all incurred at about the same time during production. However, these costs may be incurred at different points in the process. For example, in a computerized manufacturing environment, labor might be required at only the beginning and end of the process. Similarly, indirect supplies used in preparing equipment for a new batch of product might be required only at the end of each batch. In these situations, the accuracy of cost assignment might be improved if separate cost pools are used to accumulate and allocate different types of conversion costs.
- If inspection is moved to an earlier position in the manufacturing process, spoiled units have less work and less cost added before they are removed from production, thus saving costs. However, if this is done, another inspection may need to be added at a later point if units can be spoiled after the earlier point of inspection. This adds cost.
- A risk that arises when spoilage increases dramatically is the risk that more spoiled units will escape detection and be sold, which increases the risk of loss of market share due to deteriorating reputation when spoiled goods are detected by customers.
- Some pros for investing in quality improvements are increased reputation for quality, decreased warranty and replacement costs, and less liability for problems caused by defective units. Cons are the costs to improve quality, which may not outweigh the benefits, particularly if there is currently little spoilage.
- The volatility of input prices affects accountants’ choices of process costing methods. The more simple method is weighted average, but it combines last period’s costs with this period’s. If costs do not change quickly, this method is appropriate. If costs change often, and managers want to know current costs for cost control, the FIFO method is better because it measures current period work and current period costs only.
- Input prices such as direct materials or direct labor can change, the efficiency of the operation might change, if there is a large volume change, discounts might be given, or overtime could be paid. There are many other reasons that can cause actual costs to vary from the standard costs.
- When normal spoilage costs are transferred to another department, they are added to the cost of good units completed and transferred out that period.
Problems
- a. Risks of maintaining 300 boxes of frames as ending inventory include (but are not limited to):
- The possibility that demand for wooden picture frames will decrease, leaving OVT with worthless inventory.
- The boxes of inventory could be stolen.
- The boxes could be damaged by heat or cold or water if the storage facility has any problems.
- Joanne should probably not expect the cost per equivalent unit in each department to be the same from month to month, although the costs may vary within only a small range. The cost per equivalent unit might vary because of differences in production levels, fluctuations in worker efficiency, variations in raw material or overhead costs, changes in cost flow assumptions, or changes in the costs of raw materials.
- The cost per equivalent unit in Assembly could be the lowest of the three departments because it involves relatively unskilled labor compared to cutting and finishing. Additionally, the cost could be lowest because the Assembly Dept. uses less machinery, leading to less depreciation charges.
- Replacing direct labor workers with machines would likely decrease the direct labor cost per unit. But, because of the depreciation associated with new machinery, overhead cost per unit would likely increase.
- In both the weighted average and FIFO methods of process cost accounting, managers must account for the same total cost; in addition, both methods require the calculation of equivalent units. However, in FIFO costing, the units in beginning WIP are treated separately as they flow through the AIS. In the weighted average method, units started and completed in the current period are “lumped together” with beginning work in process. Using the weighted-average method offers the advantage of simpler computations and recordkeeping. However, if costs incurred in prior periods are significantly different from those incurred in the current period, costs may be distorted by using the weighted-average method.
- Abnormal spoilage is accounted for in a separate account in the accounting information system, such as “Loss from Abnormal Spoilage.” There is no single, correct way to account for spoilage because it requires judgment on a number of points: What constitutes normal vs. abnormal spoilage? How do managers view spoilage in the production system?
- Additional uncertainties associated with using process costing to calculate the cost of a picture frame include (but are not limited to):
* Determining the pattern in which conversion costs are added to production
* Determining the pattern in which direct materials are added to production , if they are added other than at the beginning
* Distinguishing between normal and abnormal spoilage
- a. Depending on the production process, all of the units in work in process inventories might be at different stages of completion. When work is at many different stages of completion, estimating the average percentage of completion for ending inventories involves some guesswork. However, estimation is often required even if all units are at the same stage of production. It may not be possible to determine exactly what proportion of costs has been incurred at each point in the production process. Direct materials are usually easiest to measure; labor and overhead (i.e., conversion costs) may be quite difficult.
- The suggested method seems to be logical, and it may improve the employee’s judgment, but it is impossible to calculate or estimate an amount of completion that is completely accurate because we do not know exactly what will be required to complete them. Prices and processes could change even a little bit, or some units might become spoiled. Because we cannot foresee the exact resources needed to complete the units, we can only provide estimates of the percentage completed.
- Managers will have more accurate information about current costs, and that might be important for cost control. In addition, managers would have a better idea of throughput time (i.e., how long it takes units to move through production). A disadvantage might be the amount time it takes to develop a more accurate estimate. This investment may not be worth the benefit, particularly if there is very little work in process at the end of the period.
- a. Normal spoilage = 3,200 units (0.04 x 80,000)
Abnormal spoilage = 4,800 – 3,200 = 1,600 units at $2.50 each = $4,000
- Good units produced cost = $200,000 (80,000 x $2.50)
Normal spoilage cost = 3,200 x $2.50 = $8,000
Total cost of good units transferred out = $208,000.
- Other costs incurred because of spoilage include loss of reputation and market share because of the poor quality goods. Spoilage also results in an opportunity costs because normal profits are foregone on the spoiled units. In addition, warranty and replacement costs are incurred, as well as any liability costs for problems caused by defective units. These costs could cause loss of profits, and if severe enough, could cause the business to close.
- Normal spoilage consists of defective units that arise as part of regular operations, while all other spoilage is considered abnormal. Therefore, this question requires students to discuss uncertainties about how to identify which part of spoilage arises from regular operations. Here are some uncertainties; students may think of others:
- Random fluctuations in the quality of materials, worker performance, or other aspects of operations
- Inability to determine whether operations are in control
- Lack of experience with a particular product or process (for example, when producing a new product or a job order)
- Inability to fully anticipate results when changing the quality of materials, adopting new production processes, installing new equipment, etc.
1. Summarize Total Costs to Account For |
| Direct Materials | Conversion Costs | Total Costs |
Beginning WIP | $ 4,000 | A $ 4,800 | $ 8,800 |
Current period costs | B 36,000 | 46,200 | 82,200 |
Total costs to account for | C $40,000 | D $51,000 | E $91,000 |
2. Summarize Physical and Equivalent Units |
| Beginning WIP
80% | Work Performed This Period | Total Units to Account for |
Complete Beg. WIP
20% | Start and
Complete | Start Ending WIP
25% | Total Work Performed This Period |
Physical Units | 2,000 | 0 | F 14,000 | 4,000 | 18,000 | G 20,000 |
| | | | | | |
Equivalent Units: | | | | | | |
Direct Materials | 2,000 | H 0 | 14,000 | J 4,000 | 18,000 | L 20,000 |
Conversion Costs | 1,600 | I 400 | 14,000 | K 1,000 | 15,400 | M 17,000 |
3. Calculate Cost Per Equivalent Unit |
Direct Materials | N $2.0000 |
Conversion Costs | O $3.0000 |
Total Cost Per Equivalent Unit | $5.0000 |
4. FIFO Process Cost Report |
| Units | Total |
Beginning WIP | 2,000 | $8,800 |
Costs to complete beginning WIP | | P $1,200 |
| | |
Total cost of beginning WIP transferred out | 2,000 | Q $10,000 |
| | |
Units started, completed, and transferred out | R 14,000 | S $70,000 |
| | |
Total units completed and transferred out | T 16,000 | U $80,000 |
| | |
Ending WIP: | 4,000 | |
Direct materials | | V $8,000 |
Conversion costs | | W $3,000 |
Total ending WIP cost | | X $11,000 |
| | |
Total Units Accounted For | 20,000 | |
Total Costs Accounted For | | $91,000 |
- a. Equivalent units: DM = 117,500 cost per equivalent unit DM = $204,800/117,500 = $1.74
Equivalent units: CC = 16,000 x 25% + 100,000 + 17,500 x 40% = 111,000, cost per equivalent unit CC =( $72,150 + $127,650)/111,000 = $199,800/111,000 = $1.8.
- If the percentage completion is underestimated, then too few units were used in the denominator and equivalent unit cost is too high this period. Income will be understated this period and overstated next period, as will balance sheet accounts.
- Next period FIFO would show lower costs per unit because that method uses the most current costs.
Chapter 7: Activity-Based Costing and Management
Learning Questions | True / False | Multiple Choice | Matching | Exercises | Short Answer | Problems |
1. What is activity-based costing (ABC)? | 1-5 | 1-8, 81
S: 84, 86, 87, 94, 95
W: 109, 111 | 1 | 1 | 8 | 1, 2 |
2. What are activities, and how are they identified? | 6-8 | 9-17, 29
W: 99, 104-107 | 2 | 2 | 1, 2, 9 | 3 |
3. What process is used to assign costs in an ABC system? | 9-17 | 18-28, 30, 31-46, 77-80, 82, 83
S: 88-91, 96
W: 100, 101, 112, 113
S: 85, 92
W: 110 | 3, 4, 5, 7 | 3, 4 | 11 | 1, 2, 3 |
4. What is activity-based management (ABM)? | 18-24 | 47-58
W: 98, 102, 103 | 4, 6, 7 | | 3, 4, 5, 7 | 1, 2, 3, 4 |
5. What are GPK and RCA? | 28-29 | | | | 12 | |
6. How does information from ABC, GPK, and RCA affect managers’ incentives and decisions? | 25-27 | 59-76
S: 93
W: 97, 108 | | 4 | 6, 10 | 2, 3, 4 |
S: Questions from the study guide
W: Questions from web quizzes on the student web site
Level of Complexity* | True / False | Multiple Choice | Matching | Exercises | Short Answer | Problems |
Foundation: Repeat or paraphrase information; Reason to single correct solution; Perform computations; etc. | All | All | All | All | 1, 2, 4, 7 | 1, 2, 3, 4 |
Step 1: Identify the problem, relevant information, and uncertainties | | | | 3, 4 | 5, 9 | 2, 3, 4 |
Step 2: Explore interpretations and connections | | | | | 3, 6, 8, 10, 11 | 1, 3, 4 |
Step 3: Prioritize alternatives and implement conclusions | | | | | | |
Step 4: Envision and direct strategic innovation | | | | | | |
*Based on level in Steps for Better Thinking (Exhibit 1.10, textbook p. 16):
Note: Step 1, 2, 3, and 4 questions in this test bank are intentionally open-ended and subjective, giving students the opportunity to demonstrate skills such as judgment, reasoning, identification of uncertainties, identification or analysis of pros and cons, and so on. Therefore, student answers may not exactly match those shown in the solutions.
True / False
- Both activity-based costing and traditional costing allocate overhead costs to cost objects.
- Activity-based costing increases the accuracy of cost measurement by using arbitrary cost allocation bases for overhead.
- Unlike activity-based costing, traditional costing systems never use multiple cost pools for overhead allocation.
- Generally speaking, activity-based costing traces direct costs more accurately than traditional costing.
- An activity is a type of task or function performed in an organization.
- In an activity-based costing system, both organization-sustaining and facility-sustaining activities are assumed to be unaffected by the number of customers.
- Product advertising for a new product is an example of a customer-sustaining cost in an ABC system.
- Administrative salaries are an example of an organization-sustaining cost in an ABC system.
- When applying ABC concepts to the determination of product costs, the first step is to identify activities.
- In an ABC system costs are first assigned to cost pools, then always to units of product.
- Each cost pool in an ABC system has at least one cost driver.
- Each cost pool in an ABC system has its own cost allocation rate.
- In an ABC system, a “cost object” could be a unit of product, a product line, or a customer.
- Ideally, activity costs in an ABC system are allocated to cost objects using a driver that explains changes in activity costs.
- The terms “cost driver” and “allocation base” are interchangeable.
- Accountants normally can determine cost drivers for all cost pools on their own, without consulting other employees in the organization.
- Information about potential cost drivers may be requested from employees directly involved in activities.
- Activity-based management and activity-based costing are two ways of describing the same thing.
- Organizations interested in using activity-based management must first implement an activity-based costing system.
- All organizations that use activity-based costing also use activity-based management.
- Activity-based management can be used to manage both quality and constrained resources.
- Managers can use activity-based management to control environmental costs.
- ABC systems allow managers to focus on measurement at the activity level.
- ABC systems measure resource flows in an organization.
- The costs of designing and implementing an ABC system include employee time and training.
- The availability of activity costs is inversely related to the cost of implementing an ABC system.
- One of the uncertainties associated with ABC and ABM systems is employee response to design and implementation.
- Under GPK a cost center is a department or larger cost object.
- GPK uses proportional costs, not variable costs.Multiple Choice
- Cost accounting systems were originally developed to
- Assign costs to products for financial reporting purposes
- Assign costs to products for tax reporting purposes
- Give managers better information for making decisions
- Allocate direct costs to cost objects
- Which method(s) do traditional accounting systems use to assign the following costs to cost objects (departments or units)?
Direct Costs Overhead Costs
- Allocate Trace
- Trace Allocate
- Allocate Allocate
- Trace Trace
- Which of the following statements about costing systems is true?
- Both traditional and activity-based costing systems use a two-stage allocation process
- Traditional costing systems use a two-stage allocation process, but ABC systems require three stages
- ABC systems typically use a two-stage allocation process, whereas traditional systems use a single stage
- Both traditional and activity-based costing systems use a three-stage allocation process
- ABC systems are similar to traditional costing systems in the way they
- Allocate direct costs to cost objects
- Define cost allocation bases
- Trace direct costs to cost objects
- Trace indirect costs to activities
- ABC systems differ from traditional systems in that ABC systems
- Trace direct costs to cost objects
- Use multiple cost pools and cost drivers to allocate direct costs
- Use multiple cost pools and cost drivers to allocate overhead costs
- Assign costs only to units of product
- APL Corporation allocates overhead to cost objects using a two-stage process. From this information, we can infer that APL
- Uses a traditional costing system
- Uses an activity-based costing system
- May be using either a traditional or an activity-based costing system
- Is reporting its product costs accurately
- Compared to a traditional costing system, an activity-based costing system usually involves
- Fewer cost pools
- More cost pools
- The same number of cost pools
- Bigger cost pools
- ABC systems differ from traditional costing systems because ABC systems use
- Multiple activity cost pools and cost drivers to allocate overhead costs
- Multiple activity cost pools and cost drivers to allocate direct costs
- More automation and information technology to allocate overhead costs
- Less automation and information technology to allocate overhead costs
Use the following information for the next 5 questions.
Le Pavilion is an historic hotel just outside the French Quarter in New Orleans. It is owned by Refined Hotels, which operates additional properties in Chicago, Cincinnati, and San Antonio. Le Pavilion has 9 floors, with approximately 20 rooms per floor. Facilities also include a workout room, restaurant, and pool. The hotel is organized in 5 departments: front desk, engineering, housekeeping, food & beverage, and customer relations. As part of its operation, Le Pavilion regularly incurs the following costs:
General manager’s salary
Housekeeping supplies
Utility costs
Depreciation on workout room equipment
Advertising
Food and beverage costs
Depreciation on restaurant equipment
- If Le Pavilion is the cost object, which of the following best describes the general manager’s salary?
- Batch-level cost
- Customer-sustaining cost
- Facility-sustaining cost
- Organization-sustaining cost
- From the perspective of Refined Hotels, advertising specifically for Le Pavilion is best described as a(n)
- Unit-level cost
- Customer-sustaining cost
- Product-sustaining cost
- Batch-level cost
- Advertising for the Refined Hotels chain is best described as a(n)
- Facility-sustaining cost
- Organization-sustaining cost
- Product-sustaining cost
- Batch-level cost
- Which cost listed above is most likely to be a customer-sustaining cost?
- Depreciation on workout room equipment
- Utility costs
- Housekeeping supplies
- General manager’s salary
- Le Pavilion could define its cost objects as
- Customers only
- Departments only
III. Number of employees
- I only
- I and II only
- II only
- I, II, and III
- Which of the following activities involves managing a plant, area, or location within an organization?
- Organization-sustaining
- Facility-sustaining
- Customer-sustaining
- Product-sustaining
- In an ABC system, an activity is best defined as a
- Type of task performed in an organization
- Collection of activities in a particular department
- Collection of cost drivers associated with a particular cost pool
- Group of cost pools associated with a particular department
- Which category of the ABC hierarchy has costs that are primarily fixed and activities with little or no cause-and-effect relationship with costs?
- Unit-level
- Batch-level
- Organization-sustaining
- Product-sustaining
- Managers are most likely to identify activities in an ABC system by
- Examining the financial statements
- Forecasting market demand using the high-low method
- Consulting employees
- Tracking general ledger account balances
- Which of the steps listed below normally occurs first when assigning costs in an ABC system?
- Assign costs to activity-based pools
- Allocate activity costs to each cost object
- Identify activities
- Identify the relevant cost object
- Which of the following is not part of the process used to assign costs in an ABC system?
- Identify activities
- Differentiate value-adding and non-value-adding activities
- Identify the relevant cost object
- Assign costs to activity-based pools
- In an ABC system, a cost driver must be chosen for each
- Activity
- Cost pool
- Cost object
- Unit-level activity
Use the following information for the next 6 questions.
Tutors-R-Us provides academic enrichment and review activities for high school students in 4 subject areas: English, mathematics, science, and history. In November 20×1, the firm’s information system produced the following data:
Number of Number of Percent of Direct
Tutors Students Faculty Costs
English 4 20 10% $ 6,000
Mathematics 3 24 25 8,000
Science 5 15 50 12,000
History 2 8 15 3,000
Regardless of subject area, clients pay $50 per hour for tutoring services. Costs associated with the Tutors-R-Us operations for November 20×1 included:
Facility rent $2,500
Custodial services 1,800
Utilities 600
Computer equipment depreciation 800
Advertising 400
- Which of the following could be a cost object for Tutors-R-Us?
- A student
- A subject area
III. A cost pool
- I and II only
- II and III only
- I and III only
- I, II, and III
- The number of students in each area is most likely to be a cost driver for
- Utility costs
- Advertising costs
- Cost for tutors
- Price charged for tutoring
- Which of the following is the most logical allocation base for facility rent if the relevant cost object is a subject area (product line)?
- Number of tutors
- Direct costs
- Percentage of square feet occupied
- Direct labor hours
- If the number of tutors in each area is the cost driver for custodial services, the total custodial services cost allocated to history would be:
- $450
- $270
- $257
- None of the above
- Which of the following groups of costs are most likely to have a common cost driver?
- Advertising & computer equipment depreciation
- Computer equipment depreciation & utilities
- Utilities & custodial services
- Utilities & advertising
- Assume Tutors-R-Us allocates facility rent, custodial services, and utilities on the basis of square feet occupied and computer equipment depreciation on the basis of number of students. Advertising is not allocated. If students received 200 hours of mathematics tutoring in November 20×1, what will the total profit from mathematics tutoring be for the same period?
- $10,000
- $8,775
- $8,488
d.. $488
Use the following information for the next 5 questions.
The FSOJ Company undertakes the following activities in its production operation and incurred the following costs during the first half of 20×2:
Harvest oranges $25,000
Prepare oranges for processing 20,000
Extract juice from oranges 18,000
Process juice into orange juice concentrate,
orange juice or orange popsicles 30,000
Package completed products 9,000
(continued on the next page)
Processing the juice into 3 final products involves the use of 2 machines, each of which incurred depreciation costs of $15,000 for the first half of 20×2. Each product requires a different set up on the processing machines, so FSOJ normally sets up the machines to produce concentrate for the first week of each month. The machine is then set up to produce orange juice for the next 2 weeks. Finally, workers set up the same machines to produce orange popsicles during the last week of each month.
During the first half of 20×2, 20% of the oranges harvested were turned into orange juice concentrate, 50% were processed into orange juice, and 30% became orange popsicles. The relative sales values of each product were: 75% for orange juice, 20% for orange juice concentrate, and 5% for popsicles. The orange juice concentrate operation takes up 40% of FSOJ’s total factory space. Regular orange juice and orange popsicles occupy 35% and 25%, respectively.
- Which of the preceding costs would most likely have “number of setups” as its cost driver?
- Harvest oranges
- Package completed products
- Process juice
- Extract juice
- Preparing oranges for processing involves peeling and removing seeds. The best cost driver for the cost of preparing oranges for processing would be
- Square feet occupied by the preparation equipment
- Percent of oranges harvested for each product line
- Direct labor hours
- Total direct costs
- Which of the following activities is likely to be classified as product-level?
- Packaging
- Harvesting
- Extracting
- Prepare oranges for processing
- Assume processing costs are allocated on the basis of number of machine setups. How much processing cost will be allocated to each product line?
- $5,000 to each product line
- $7,500 each to orange juice concentrate and orange popsicles, and $15,000 to orange juice
- $10,000 to each product line
- None of the above
- If juice extraction costs are allocated to product lines based on relative sales values, that is, each product line’s portion of total sales, the amount allocated to popsicles will be
- $900
- $5,400
- $4,500
- None of the above
- At least one cost driver is required for each ABC cost
- Activity
- Pool
- Object
- Product line
- Ideally, activity costs are allocated to cost objects using a ___ that explains changes in activity ___.
- Pool, Cost
- Pool, Driver
- Driver, Cost
- Driver, Pools
- A cost driver is
- A measure of activity that causes costs to fluctuate
- Only used in ABC systems
- Seldom related to cost changes in an ABC system
- Usually related to cost changes in a traditional costing system
- An allocation base is
- Normally related to cost changes in a traditional costing system
- A measure of activity that causes costs to fluctuate
- Seldom related to cost changes in an ABC system
- Often used incorrectly as a synonym for “cost driver”
- Which of the following statements is true?
- Cost drivers are a special kind of allocation base
- Allocation bases are a special kind of cost driver
- Cost drivers and allocation bases are two names for the same thing
- Allocation bases are seldom used in traditional costing systems
- The best allocation base choice for an ABC cost pool is a(n)
- Cost driver
- Activity dictionary
- Allocation rate
- Financial measure
Use the following information for the next 4 questions.
Suppose the Issaquah Blood Bank has identified an individual blood drive as its cost object. It has established the following cost pools in developing an activity-based costing system:
Non-medical personnel costs. Salaries and wages of the office staff who organize blood drives and keep donor records.
Medical personnel costs. Salaries and wages of doctors and nurses who staff a blood drive.
Medical supplies. Cost of needles, bandages, and containers for donated blood.
Non-medical supplies. Costs of refreshments for blood donors and recordkeeping supplies.
Blood drives typically require 5 to 7 beds for blood donors. Each donation requires one container (in the medical supplies cost pool), one needle, and one set of bandages. The American Red Cross normally receives donated space from a community organization (such as a university or company) for each blood drive.
- The most likely cost driver for the medical personnel cost pool is
- Number of blood donors
- Number of beds
- Percentage of square feet occupied by the blood drive
- Dollar value of blood donated
- The most likely cost driver for non-medical supplies is:
- Number of blood donors
- Number of beds
- Hours available for blood donations
- Percentage of square feet occupied by the blood drive
- The most likely cost driver for the medical supplies cost pool is
- Number of beds
- Hours available for blood donations
- Percentage of square feet occupied by the blood drive
- Number of blood donors
- Non-medical personnel costs would be most appropriately allocated using
- Number of blood drives organized
- Number of blood donors
- Hours available for blood donations
- Dollar value of blood donated
- Cost drivers are most likely to be identified using information
- From the financial statements
- Elicited from customers
- Elicited from employees involved in related activities
- From textbooks
- The managers of HRY Corporation are analyzing some of their corporate costs to determine the costs of each department’s use of administrative services. The accountant wants to allocate the costs of payroll processing using an activity-based costing system. The most appropriate cost driver for the payroll processing cost pool is the
- Number of pay periods per month
- Number of employees
- Average hourly wage for all employees
- Maximum number of deductions from an individual employee’s paycheck
- FNG Corporation employs 4 purchasing agents. Rick processes purchase orders for vendors starting with the letters A through H, while Merrill does the same task for vendors from I through N. Esteban deals with vendors in the O through R range, and Kathy handles the rest of the alphabet. The most likely cost driver for the purchasing agents’ salaries is the
- Number of vendors within each alphabetical segment
- Number of purchase orders processed each month
- Average dollar amount of each purchase order
- Number of product lines FNG produces
- MNK Corporation is a large public company that employs numerous accounts receivable clerks. Their jobs involve processing invoices and keeping the accounting records updated. Which of the following is the most likely cost driver for the accounts receivable activity cost pool?
- Number of journal entries
- Number of product lines produced by MNK
- Number of invoices
- Average dollar amount for each credit sale
- Lookin’ for a Home is an animal shelter in Omaha, Nebraska. The shelter relies on government grants and private donations for funding. It takes in homeless dogs and cats and keeps them until they are adopted by qualified individuals. One of the shelter’s cost pools is animal recordkeeping, which involves maintaining a database with details about each animal in the shelter. Which of the following is the most appropriate cost driver for the animal recordkeeping cost pool?
- Number of government grants sought
- Number of employees who work in the shelter
- Number of animal intake and adoption transactions
- Square feet allocated to the recordkeeping operation
- The process of using ABC information to evaluate the costs and benefits of production and internal support activities is called
- Activity-based management
- Activity-based budgeting
- Activity-based costing
- Activity-based consulting
- Activity-based management relies on
- Accurate ABC information
- Objective financial reporting
- Outside consultants
- Participative management techniques
- Activity-based costing information can be used to identify the relative cost of maintaining different customers. Managers can use that information, coupled with activity-based management techniques, to manage
- Customer quality
- Customer profitability
- Inventory levels
- Staffing levels in the marketing department.
- Managers can use ABM information to manage customer profitability. The most valuable groups of customers are those having the following characteristics
Types of Service
Products Ordered Requirements
- High-margin Extensive
- High-priced Low
- Low-margin Low
- High-margin Low
- Phuong is a customer of PVL Corporation. She consistently orders low-margin products, but requires costly services from PVL. In employing ABM techniques to manage customer profitability, PVL’s staff should
- Make no changes in service to Phuong
- Develop creative approaches to managing Phuong as a customer
- Require Phuong to pay for all orders in cash
- Classify Phuong as a value-added customer and increase the amount of services provided to her
- Value-added activities
- Increase revenues
- Increase the worth of an organization’s goods and services to customers
- Increase the worth of an organization’s goods and services to stockholders
- Increase costs that are unrelated to customers
- BVH Corporation manufactures and sells cellular phones. Which of the following activities is least likely to be considered a value-added activity for BVH?
- Repairing phones
- Offering phones for sale in designer colors
- Making phones smaller
- Creating several ring-tone options for cellular phones
- ABC can be used to determine the costs of quality and to help refine quality strategies. Quality activities are commonly classified as
- Internal or external
- Value-added or non-value-added
- Prevention, appraisal, production, or post-sales
- Process-oriented or job-oriented
- Activities performed to insure defect-free production are called
- Post-sales activities
- Production activities
- Prevention activities
- Appraisal activities
- Product inspections are an example of
- Appraisal activities
- Production activities
- Prevention activities
- Post-sales activities
- NRL Corporation’s accounting information system reported warranty repair and product replacement costs totaling $12,000 in a recent accounting period. These costs are an example of which of the following quality costs?
- Period costs
- Post-sales activity costs
- Activity-based costs
- Prevention activity costs
- How can ABC information be used to manage constrained resources?
- ABC information cannot be used to manage constrained resources
- ABC information can help managers identify the best way to relax constraints
- ABC information can help managers decrease the rate at which products get through the manufacturing process
- ABC information can help managers justify price increases due to constrained resources
- Which of the following is not a benefit of an ABC system?
- Helping managers focus on measurement at the activity level
- Increasing profits
- Improving accuracy in cost measurement
- Motivating employees to find ways to improve performance
- Costs associated with developing an ABC system most likely include
- Reduced profits
- Loss of market share
- Employee time and consulting fees
- Increased overhead costs
- When implementing an ABC system, the accounting information system may require modifications to
- Include fewer ledger accounts
- Include only costs from the most recent periods
- Gather and report activity and cost driver information
- Include more ledger accounts
- The cost of implementing an ABC system is likely to be lower if the number of times an activity is performed
- Is low
- Is high
- Does not fluctuate seasonally
- Can easily be tracked
- For small manufacturing firms, ABC systems are best with
Number of Number of
Activities Cost Drivers
- Few Few
- Many Few
- Many Many
- Few Many
- ABC systems are typically associated with
- Higher quality and improved cycle time
- Manufacturing firms, but not service firms
- Service firms, but not manufacturing firms
- Higher profitability for all firms that implement them
- Which of the following factors are associated with successful ABC implementations?
- Top management support and high market share
- Performance evaluations and low market share
- Top management support and performance evaluations
- Middle management support and high market share
- Which of the following do managers use in choosing activities and cost drivers to include in an ABC system?
- Linear programming
- Simple regression
- Judgment
- Activity-based management
- As the number of activities in an ABC system increases, measurement error tends to
- Increase
- Decrease
- Stay the same
- Focus more on top management
- In general, the risk of measurement error in an ABC system increases when
- Costs are traced rather than allocated
- Managers are uncertain about the relationship between costs and cost pools
- The number of cost pools decreases
- A company uses a team approach to systems design
- Similar to other costing systems that include allocation, ABC cost information may be misleading for decision making purposes. To combat this problem, costs within an activity can be classified as
- Flexible or committed
- Flexible or variable
- Fixed or committed
- Product or period
- In an ABC system, flexible costs
- Vary with activity levels
- Remain fixed regardless of activity levels
- Should not be included in ABC cost pools
- Are related to capacity
- In an ABC system, committed costs
- Vary with capacity levels
- Vary with activity levels
- Should not be included in ABC cost pools
- Are related to capacity
- To provide better decision making information about products, ABC systems can be set up with separate activity pools and cost rates for
- Different levels of the ABC cost hierarchy
- Committed and flexible costs within each cost pool
III. Different customers based on profitability levels
- I and III only
- II and III only
- I and II only
- I, II, and III
- Uncertainties associated with ABC and ABM include
- The appropriate choice of activities
- The appropriate choice of cost drivers
III. Employee response to the system
- I, II, and III
- I and III only
- I and II only
- II and III only
- Caring Change Medical Practice specializes in plastic surgery. Which of the following costs is most likely to be a committed cost in its operations?
- Medical supplies
- Office supplies
- Hourly wages paid to bookkeeper
- Facility rental
- Caring Change Medical Practice specializes in plastic surgery. Which of the following is least likely to be a committed cost in its operations?
- Facility rental
- Hourly wages of custodial staff
- CEO’s salary
- Electricity for heat and lights
- When managers use ABC cost allocation rates for decision making without distinguishing between flexible and committed costs, their estimates of incremental costs are biased upward or downward. If activity levels are steadily increasing over time, this bias would provide
- Information that overstates costs
- Information that understates costs
- Accurate information
- Reliable information
Use the following information for the next 4 questions.
Quick Start Engines has two departments, Assembly and Testing. You are given the following information about the costs of 5 activities that occur at the manufacturing plant monthly:
Activity Total Costs Volume of Cost Driver
- Material handling $100,000 200,000 parts
- Supervision of direct labor 105,000 70 employees
- Janitorial and cleaning 150,000 3,000 hours
- Machining 240,000 6,000 machine hours
- Total costs $595,000
(continued on the next page)
The above activities are used by the two departments as follows:
- Assembly Testing
- Material handling 150,000 parts 50,000 parts
- Supervision of direct labor 30 employees 40 employees
- Time spent cleaning 2,000 hours 1,000 hours
- Number of machine hours 4,000 machine hours 2,000 machine hours
- How much of the material handling cost will be allocated to Assembly?
- $75,000
- $25,000
- $66,667
- $33,333
- What is the ABC allocation rate for supervision of direct labor?
- $3,500 per employee
- $1,500 per employee
- $0.50 per part
- $50 per hour spent in supervision
- How much of the janitorial costs will be allocated to Testing?
- $25,000
- $75,000
- $100,000
- $50,000
- How much of the total activity costs will be allocated to Assembly?
- $300,000
- $275,000
- $380,000
- $350,000
Use the following information for the next 2 questions.
Flowing Wells Corporation is preparing its annual budget. As part of its analysis of the contribution of individual products to overall profitability, the controller estimates the amount of overhead that should be assigned to the individual product lines. Budgeted inspection costs are $4,800. Additional information is as follows:
Small Pumps Large Pumps
Units inspected 120 120
Hours spent inspecting 2.5 17.5
Direct labor hours per unit 2 2
- Under a traditional costing system that assigns overhead on the basis of direct labor hours, the inspection costs allocated to one small pump would be
- $10
- $15
- $20
- $24
- Under activity-based costing (ABC), the inspection cost assigned to one small pump would be
a $2.50
- $5.00
- $12.50
- $10.00
- Costs assigned to an activity pool for teaching children to swim at the county park are $2,700 per month. Number of students is chosen as the cost driver. On average, 300 students take swim lessons monthly. What is the ABC allocation rate for this activity?
- Not enough information given
- $27.00
- $9.00
- $0.90
Multiple Choice from Study Guide
s84. A cost system will be improved if
- As many costs as possible are classified as direct costs
- Indirect cost pools include costs that have the same cost driver
- Each indirect cost pool uses the same cost driver
- Both (a) and (b)
s85. Which of the following is the best cost driver for the activity “distributing products” if the final cost object is the product?
- Number of trucks in the fleet of delivery vehicles
- Total pounds of product delivered
- Direct labor hours used in producing the products
- The number of people who work in the distribution activity
s86. ABC provides more accurate product costs than traditional costing because
- Traditional costing uses fewer cost pools for indirect costs
- Traditional costing is less likely to have indirect cost pools with similar cost behavior
- Activities are measurable events, and activity counts often make good cost drivers in ABC because there is a better cause-and-effect relationship with costs
- All of the above
s87. Product costs under traditional costing will be the most different than product costs under ABC when the
- Products consume different amounts of direct materials
- Products consume different amounts of direct labor
- Products are made at different times of the year
- Products require differing amounts of special services during production
Use the following information for the next 4 questions.
Iowa Industries has two divisions, North and South. You are given the following information about the costs of 5 activities that occur at corporate headquarters:
- Activity Total Costs Activity-cost drivers
- Managing accounts payable $100,000 4,000 hours
- Managing human resources 200,000 700 employees
- Managing accounts receivable 150,000 3,000 hours
- Managing computer network 250,000 500 computers
- Total costs $700,000
The above activities are used by the two divisions as follows:
- North Division South Division
- Accounts payable hours 1,500 hours 2,500 hours
- Number of employees 300 employees 400 employees
- Accounts receivable hours 2,000 hours 1,000 hours
- Number of computers 200 computers 300 computers
s88. How much of the accounts payable cost will be allocated to North Division?
- $262,500
- $37,500
- $62,500
- $100,000
s89. How much of the human resource cost will be allocated to South Division?
- $28,571
- $150,000
- $85,714
- $114,286
s90. How much of the total activity costs will be allocated to South Division?
- $323,214
- $376,786
- $341,463
- $358,537
s91. How much of the total activity costs will be allocated to North Division?
- $323,214
- $376,786
- $341,463
- $358,537
s92. For which of the following is it more likely to be difficult to find a good cost driver?
- Unit-level costs
- Batch-level costs
- Customer-sustaining costs
- Organization-sustaining costs
s93. Regarding the use of ABC product cost information for short-term decision making, which of the following is likely to be true?
- Flexible costs should be excluded from the computation of product cost
- Committed costs should be excluded from the computation of product cost
- ABC product cost information should not be used for most short-term decisions
- ABC product cost information cannot be used for decision making when there are constrained resources
s94. In traditional costing, the cost allocation base used for overhead is most likely a
- Unit-level cost driver
- Batch-level cost driver
- Customer-sustaining cost level driver
- Facility-sustaining cost level driver
s95. Ted’s Manufacturing makes two products, B and C. They each take 2 direct labor hours and 2 machine hours to produce. A batch of Product B, however, uses twice the number of machine set-ups and requires 3 times as many materials requisitions as does Product C. Which of the following is most likely true?
- The product cost of Product C will be higher under ABC than under traditional costing
- Traditional costing assigns a product cost that is too low to Product B
- Traditional costing assigns a product cost that is too low to Product C
- The product cost of Product B will be higher under ABC than under traditional costing
s96. What is the correct order for the steps in the process to implement an ABC system?
- Assign costs to the activity cost pools
- Choose a cost driver for each activity cost pool
- Calculate an allocation rate for each activity cost pool
- Allocate activity costs to the final cost object
- Identify activities
- Identify the relevant cost object
- 6, 2, 1, 3, 4, 5
- 5, 6, 2, 1, 3, 4
- 5, 6, 1, 2, 3, 4
- 6, 5, 1, 2, 3, 4
Multiple Choice from Web Quizzes (Available on Student Web Site)
w97. Activity Based Costing can be used for
- Allocating manufacturing overhead
- Allocating nonmanufacturing department costs
III. Determining customer related costs
- I and II only
- II and III only
- I, II, and III
- II only
w98. All of the following are uses of Activity Based Management except
- Determining costs for the general ledger
- Determining quality costs
- Determining customer profitability
- Determining non-value-added activities
w99. Which costs are least likely to be allocated to units under ABC?
- Facility-sustaining costs
- Batch-level costs
- Product-sustaining costs
- Unit-level costs
w100. Costs assigned to an activity pool for vaccinating children at a well child clinic are $2,700 per month. Number of vaccinations is chosen as cost driver. On average, 300 vaccinations are given monthly. What is the ABC allocation rate for this activity?
- Not enough information given
- $27.00
- $9.00
- $0.90
w101. Which of the following is performed first in setting up an ABC system?
- Identify relevant cost objects
- Assign costs to the costs pools
- Identify activities that are part of the manufacturing or service delivery process
- Allocate activity costs to the cost objects
w102. All of the following are quality-related activities except
- Prevention activities
- Production activities (spoilage and rework)
- Activities undertaken to advertise high quality
- Post-sales activities
w103. Operating efficiency improves with ABM through the use of ABC information to better manage
- Customer profitability
- Direct material costs
- Advertising costs
- Budgets
w104. The cost hierarchy for an ABC system includes
- Unit-level activities
- Marketing activities
III. Product-sustaining activities
- Administrative activities
- I and III only
- II and IV only
- I and II only
- III and IV only
w105. Unit-level costs in ABC
- Are the same as variable costs
- Include the cost of advertising a product
- Include the costs of setups for new batches of units
- Include indirect materials for each unit
w106. Product-sustaining costs include
- Raw materials
- The cost of advertising a product
- Depreciation of the manufacturing plant
- Tooling for a custom job
w107. Batch-level costs include
- Raw materials
- The cost of advertising a product
- Depreciation of the manufacturing plant
- Tooling for a custom job
w108. Which is an advantage of an ABC system?
- ABC results in true product costs
- ABC has little measurement error
- ABC systems allow accountants to identify non-value adding activities
- ABC is inexpensive to implement
w109. One difference between a traditional costing system and an ABC system is
- An ABC system allocates overhead to units of goods or services
- An ABC system has more cost pools and more cost drivers
- An ABC system traces direct materials to units and considers them to vary with volume
- Information from an ABC system can be used for GAAP
w110. (CMA) Cost drivers are
- Activities that cause costs to increase as the activity increases
- Accounting techniques used to control costs
- Accounting measurements used to evaluate whether or not performance is proceeding according to plan
- A mechanical basis, such as machine hours, computer time, size of equipment, or square feet of factory, used to assign costs to activities
w111. What is the normal effect on the numbers of cost pools and allocation bases when an ABC system replaces a traditional cost system?
Cost Pools Allocation Bases
- Decrease Decrease
- Decrease No effect
- No effect Increase
- Increase Increase
Use the following information for the next 2 questions.
(CMA) Flagler Corporation is preparing its annual profit plan. As part of its analysis of the profitability of individual products, the controller estimates the amount of overhead that should be assigned to the individual product lines from the information given as follows:
Wall Mirrors Specialty Windows
Units produced 25 25
Material moves per product line 5 15
Direct labor hours per unit 200 200
Budgeted materials handling costs are $50,000.
w112. Under a costing system that assigns overhead on the basis of direct labor hours, the materials handling costs allocated to one unit of wall mirrors would be
- $1,000
- $500
- $2,000
- $5,000
w113. Under activity-based costing (ABC), the materials handling costs assigned to one unit of wall mirrors would be
- $1,000
- $500
- $1,500
- $2,500
Matching
- Traditional costing and activity-based costing share some similarities, but are also different in significant ways. For each statement below, indicate whether it is a characteristic of: (A) activity-based costing only, (T) traditional costing only, (B) both traditional and activity-based costing, or (X) neither traditional nor activity-based costing.
____ 1. Allocates direct costs to cost of goods sold
____ 2. Assign manufacturing production costs to individual units in inventory
____ 3. Attempts to trace costs more accurately to products, product lines or departments
____ 4. Can employ multiple cost pools
____ 5. Commonly uses labor or machine hours as a cost allocation base
____ 6. Costs are assigned to units in the first stage; units to inventory in the second
____ 7. Requires judgment to develop allocation rates
____ 8. Multiple cost pools and drivers are used in the allocation process
____ 9. Originally developed primarily to assign costs to products for financial reporting
____ 10. Overhead costs are first assigned to pools, then allocated to individual units
- Quality Limousines maintains a fleet of ten limousines: 5 extended sedans used for airport transportation, 3 stretch limousines used for transportation to and from local events, and 2 ultra-stretch limousines used for all-night parties. Quality considers its “units” as individual vehicle bookings. Product lines are associated with the 3 types of vehicles. A “batch” of units constitutes all of the bookings for a particular date.
Various costs associated with Quality’s operations are listed below. Indicate whether each cost most likely relates to a(n): (A) organization- or facility-sustaining activity, (B) customer-sustaining activity, (C) product-sustaining activity, (D) batch-level activity, or (E) unit-level activity.
____ 1. Cost of consultants who perform customer-satisfaction surveys for arriving airport passengers
____ 2. Driver salaries for January 20×2
____ 3. Fuel costs for extended sedans during December 20×1
____ 4. General advertising campaign promoting all three product lines
____ 5. Supplies for an ultra-stretch limousine booked on February 14, 20×2
____ 6. Maintenance costs for ultra-stretch limousines
____ 7. Market research conducted in local high schools
____ 8. Salary of Quality’s chief operating officer
____ 9. Special advertising promotion in connection with a local football championship
____ 10. Consultant’s salary for designing Quality’s web page
- The steps to assign costs in an ABC system are listed below in random order. Number the steps in the correct order (1 through 6).
____ Assign costs to activity-based cost pools
____ Calculate an allocation rate for each cost pool
____ Choose a cost driver for each cost pool
____ For each ABC cost pool, allocate activity costs to the cost object
____ Identify activities
____ Identify the relevant cost object
- Reliable Reminders Inc. is a personal service firm located in Claremont, California. The firm collects lists of birthdays, anniversaries and other memorable dates from its clients, and offers 3 levels of service. Level One clients receive an e-mail reminder of their important dates at least a week in advance. Level Two clients receive both an e-mail reminder and an appropriate greeting card. Level Three clients receive an e-mail reminder, an appropriate greeting card, and a recommended gift. Level One clients arrange their services through 3 customer service representatives. Reliable also employs 4 customer service representatives for Level Two clients, and 2 representatives for Level Three clients.
Reliable Reminders incurs the following costs as part of its operations, and it uses the following cost drivers. Management wants to calculate the cost of each level of service.
Activity Total Cost Cost Driver
Facility rent $3,500 Square feet
Utilities 1,200 Number of customer service representatives
Office supplies 800 Number of clients
You may find the following information helpful:
Level One Level Two Level Three
Square feet 1,000 1,500 1,000
Number of clients 8 20 12
Average weekly hours for each
customer service representative 15 18 20
Average number of reminders per client 5 6 10
Direct costs $2,500 $4,200 $5,000
Based on the preceding information, match each item on the left below with the most appropriate item on the right. Each numbered item has only one correct answer. Each lettered item may be used once, more than once, or not at all. Round all unit and total costs to the nearest dollar.
____ 1. Total costs to be allocated
____ 2. Total indirect costs allocated to Level One
____ 3. Total costs for Level Three
____ 4. Level with the lowest total cost per client
____ 5. Total cost per client for Level One
____ 6. Level with the highest total cost
____ 7. Level Three’s indirect cost per client
____ 8. Level with the highest direct cost per client
____ 9. Level One’s total direct costs per client
____ 10. Level with the lowest indirect cost per client | A. $17,200
B. $11,700
C. $5,500
D. $313
E. $126
F. Between $6,500 and $6,600
G. Between $2,400 and $2,500
H. Between $1,500 and $1,600
I. Level One
J. Level Two
K. Level Three
L. Some other amount |
- Several activities commonly performed in manufacturing organizations are listed below on the left. The right column contains potential cost drivers and / or allocation bases for those activities. Match the most suitable cost driver with the best activity. Each numbered item has only one correct answer. Each lettered item may be used once, more than once, or not at all.
____ 1. Administrative salaries
____ 2. Customer market research conducted in groups of 10 customers
____ 3. Customer sales representative salaries
____ 4. Departmental janitorial services
____ 5. General technical support salaries
____ 6. Headquarters housekeeping
____ 7. Material handling wages
____ 8. Salaries of product designers
____ 9. Shipping costs
____ 10. Single product line equipment depreciation | A. Typically not allocated
B. Square feet
C. Product weight
D. Number of engineering change orders
E. Number of customer phone calls
F. Number of customers
G. Number of questions
H. Machine hours
I. No suitable cost driver or allocation base listed |
- Activity-based management information can be used in several ways, including managing quality costs. Various quality-related costs are listed below. Indicate whether each cost most likely relates to a(n): (A) prevention activities, (B) appraisal activities, (C) production activities, or (D) post-sales activities.
____ 1. Routine equipment maintenance
____ 2. Finished product testing before shipment
____ 3. Customer satisfaction surveys
____ 4. Costs of spoilage and rework
____ 5. Warranty repairs
____ 6. Incoming raw materials testing
____ 7. Costs incurred to establish supplier qualifications
____ 8. Extra shipping costs incurred to meet customer deadlines
____ 9. Machinery repair costs
____ 10. Salaries of quality control inspectors
- Several terms associated with activity-based costing and activity-based management are listed in the right-hand column below; definitions are listed on the left. Match each definition with the term it best describes. Each numbered item has only one correct answer. Each lettered item may be used only once or not at all.
____ 1. The process of using ABC information to evaluate the costs and benefits of internal support activities
____ 2. Tasks undertaken to manage a location
____ 3. Related in a logical manner and consume similar resources
____ 4. Managing customer profitability
____ 5. Increase the worth of an organization’s services to customers
____ 6. Functions undertaken to oversee the entire entity
____ 7. Assumes some downtime is unavoidable for maintenance and holidays
____ 8. An activity that causes costs to fluctuate
____ 9. A system for assigning overhead costs
____ 10. A function performed in an organization | A. A use of activity-based management
B. Activity
C. Activity-based costing
D. Activity-based management
E. Cost driver
F. Customer-sustaining activities
G. Facility-sustaining activities
H. Homogeneous activities
I. Organization-sustaining activities
J. Value-added activities
K. None of the above |
Exercises
- BCH Corporation produces and sells two types of sofa pillows: plain and fancy. Currently, BCH uses a traditional costing system with direct labor hours as the allocation base. Actual hours for 20×3 were 20,000. In anticipation of developing an activity-based costing system, BCH has identified the following cost pools and activities associated with pillow production:
Estimated Costs Actual Costs
Activity Driver for 20×4 for 20×3
Material cutting Number of cuts $16,000 $13,665
Sewing machine setups Number of setups 27,000 24,800
Factory maintenance Number of direct labor hours 15,000 17,000
$58,000 $55,465
Direct costs for a plain sofa pillow are $1.25 for material and $2.00 for direct labor (15 minutes @ $8.00 per hour). Direct costs for a fancy sofa pillow are $1.50 for material and $4.00 (30 minutes @ $8.00 per hour). In 20×4, BCH expects to make 8,000 fancy pillows and 10,000 plain pillows. Those output levels will require 5 setups for fancy pillows and 10 setups for plain pillows. For the material cutting activity, the number of cuts is estimated at 10,000 for each type of pillow.
- Calculate the cost per unit for each type of pillow under traditional costing
- Calculate the cost per unit for each type of pillow under ABC
- Under traditional costing, which type of pillow cross-subsidizes the other pillow? Explain.
- International Rental Cars incurred the following costs in a recent fiscal period:
Re-fueling cost for reservation #081859 $ 200
Custodial services for branch office in St. Louis 250
Painting costs for luxury sports cars 320
Salaries for corporate accountants 395
Generalized advertising for the firm 460
Depreciation on home office computer equipment 665
Office equipment depreciation for Pasadena branch 775
Market research with business travelers 860
Total $3,925
Calculate the total cost in each of the following categories:
- Organization-sustaining activities
- Facility-sustaining activities
- Customer-sustaining activities
- Product-sustaining activities
- Batch-level activities
- Unit-level activities
- Fun for All is an amusement park located in Yucaipa, California. It is organized into 6 departments: arcades and shows, food and beverage, rides, communications, human resources, and maintenance. Fun for All is implementing an ABC system to allocate the costs of the service activities (communications, human resources, and maintenance) to product-line departments (arcades and shows, food and beverage, and rides). Thus, the product-line departments are the cost objects. The total costs and cost drivers for each service activity are:
Activity Total Cost Cost Driver
Communication $16,000 Number of department-specific memos prepared and distributed
Human resources 21,000 Number of employees
Maintenance 18,000 Square feet
Information regarding cost drivers and allocation bases is as follows:
Number of Department-
Number Square Specific Memos
of Employees Feet Prepared & Distributed
Arcades & shows 20 5,000 6
Food & beverage 50 7,000 4
Rides 30 6,000 6
Communications 10 1,000 4
Human resources 10 1,000 3
Maintenance 30 1,000 1
Direct costs and revenues for each product-line department are as follows:
Revenues Direct Costs
Arcades & shows $50,000 $8,000
Food & beverage 125,000 6,000
Rides 150,000 4,000
- Calculate the allocation rate for each service activity
- Interpret the allocation rate for each service activity (i.e., explain what it means).
- Calculate the total service activity costs allocated to each product-line department
- Calculate the operating profit (revenues – direct costs – allocated costs) for each product-line department
[Note to Professors: The data in exercise #4 is the same as the data in multiple choice questions #27-31. However, the exercise questions differ from the multiple choice questions.]
- The FSOJ Company undertakes the following activities in its production operation and incurred the following costs during the first half of 20×2:
Harvest oranges $25,000
Prepare oranges for processing 20,000
Extract juice from oranges 18,000
Process juice into orange juice concentrate, orange
juice, or orange popsicles 30,000
Package completed products 9,000
In addition to the costs listed above, processing the juice into 3 final products involves the use of 2 machines, each of which incurred depreciation costs of $10,000 for the first half of 20×2. Each product requires a different set up on the processing machines, so FSOJ normally sets up the machines to produce concentrate for the first week of each month using 80 machine hours. The machine is then set up to produce orange juice for the next 2 weeks using 160 machine hours. Finally, workers set up the same machines to produce orange popsicles during the last week of each month, using 80 machine hours.
During the first half of 20×2, 20% of the oranges harvested were turned into orange juice concentrate, 50% were processed into orange juice, and 30% became orange popsicles. The orange juice concentrate operation takes up 40% of FSOJ’s total factory space. Regular orange juice and orange popsicles occupy 35% and 25%, respectively.
- Calculate the total costs included in the processing activity cost pool.
- Choose a cost driver for the processing activity and explain your choice. Calculate the ABC allocation rate for this activity.
- Allocate processing costs to each product line using the ABC allocation rate developed in part (b).
Short Answer
- Describe customer-sustaining activities and give one example.
- List the six ABC cost hierarchies and provide an example of one activity for each hierarchy.
- Explain why ABM might be helpful in determining environmental costs.
- List the four types of quality-related activities and give one example of each.
- Why might an organization want to track customer-related costs?
- List two benefits and two costs companies incur when they implement an ABC costing system.
- Describe activity based management.
- List two advantages and two disadvantages of implementing an ABC system compared to traditional costing.
- Describe two uncertainties that arise when managers are developing cost pools under an ABC system.
- Explain why measurement error could increase as the number of cost pools increase in an ABC system.
- Discuss the pros and cons of using a team of individuals to develop an ABC / ABM system.
- Discuss the similarities and differences between ABC, GPK, and RCA.
Problems
- Tubac Savings and Loan collects fees for 3 service activities: credit risk assessment, loan processing, and other services. During March, the overhead costs related to these three service activities totaled $500,000. Activity information and direct costs for the month were as follows:
Service Events Employee Time Direct Costs
Credit risk assessment 60,000 150 hours $300,000
Loan processing 1,000 260 hours 130,000
Miscellaneous services 9,000 90 hours 70,000
- Tubac allocates overhead using one office-wide rate based on employee time. Determine the rate and the amount allocated to each department.
- One of the commercial clients, Desert Dune Buggies, had 1,000 credit risk assessments, 50 loans processed, and 80 miscellaneous services performed this month. The total employee time used for Desert Dune Buggies was estimated to be about 11 hours, of which 8 hours were for processing loans. How much overhead would be allocated to this client using the office-wide rate?
- The overhead costs can be separated by service activity, so that all costs are traced to the service department where possible, and then costs that cannot be traced are allocated. Using this method, check processing overhead costs were $120,000, loan processing costs were $200,000, and other activities were $180,000. Number of credit risk assessments is used as the allocation base for credit checks, number of events (services) is used for miscellaneous services, and employee hours are used to allocate the costs of servicing loans. How much overhead would be allocated to Desert Dune Buggies under this system?
- Why are the amounts allocated in parts (b) and (c) different? Be specific in your answer.
- Suppose Tubac’s managers would like to compare the profitability from Desert Dune Buggies with the profitability from other commercial clients. Discuss whether the costs you calculated in part (c) represent the incremental cost of overhead for the Desert Dune Buggies account.
- Franklin Fireplace Inserts manufactures two premium models of fireplace inserts that provide more BTUs of heat per cord of wood than any other wood burning fireplace insert or stove. One model, the Heatilator, sells for $1,800, and the Heat Queen, a new model that sells for $1,200. Franklin’s marketing department suggested that the company should concentrate on the new Heat Queen model and begin to phase out the Heatilator model.
Franklin currently uses a traditional costing system. The following cost information has been used as a basis for pricing decisions over the past year.
Per-Unit Data Heatilator Heat Queen
Direct materials $200 $280
Direct labor hours 1.5 1.5
Machine hours 5.0 4.0
Units produced 11,000 4,000
Direct labor cost is $20 per hour, and the machine usage cost is $18 per hour. Manufacturing overhead costs were estimated at $4,800,000 and were allocated on the basis of machine hours.
Gwen Freely, the new company controller, suggested that an activity-based costing analysis first be performed to obtain a better picture of the true manufacturing cost. The following data were collected:
Activity Center Cost Driver Traceable Costs
Soldering Number of solder joints $ 942,000
Shipments Number of shipments 860,000
Quality control Number of inspections 1,240,000
Purchase orders Number of orders 950,400
Machining Machine hours 57,600
Machine setups Number of setups 750,000
Total traceable costs $4,800,000
Number of Events during the year:
Activity Heatilator Heat Queen Total
Soldering 296,250 96,250 392,500
Shipments 4,050 950 5,000
Quality control 14,050 5,325 19,375
Purchase orders 20,025 27,495 47,520
Machining 44,000 4,000 48,000
Machine setups 4,000 3,500 7,500
Selling, general, and administrative costs per unit sold are $175.00 for Heatilator and $125 for Heat Queen.
- Calculate the manufacturing cost per unit for Heatilator and Heat Queen under:
- A traditional costing system
- The ABC system
- Explain the differences in manufacturing cost per unit calculated in part (A).
- Which system would most likely do a better job of measuring costs for this product emphasis/keep or drop decision? Explain.
- Franklin’s controller points out that the ABC information could also be used to identify and eliminate non-value added activities. Explain how ABC and ABM can be used for this purpose.
- Offices-On-The-Go rents temporary office space to business travelers; provides copying and fax services; and sells small amounts of office supplies, such as paper, pens and notebooks. It maintains 6 facilities in the Phoenix, Arizona area, all of which report to a single corporate office. You have been hired by Priscilla Solara, the manager of Store #2, to analyze costs and make recommendations regarding quality improvements. You decide to analyze Store #2’s activities and develop an activity-based costing and activity-based management system to achieve those objectives. After reviewing documents, interviewing employees, and observing daily operations, you have compiled the following list of activities:
* Purchase office supplies. Two purchasing agents process approximately 50 purchase orders per month from 5 vendors. Their salaries total $5,000 each month. Each purchasing agent uses a computer and other office equipment, and monthly depreciation charges total $300. The purchasing operation occupies 1,200 square feet of the store’s 8,500 square-foot facility. Monthly purchases average $2,000, and about 60% of the supplies purchased are sold to customers. The remaining 40% are used in the store’s operations.
* Provide office space to customers. The store’s main source of revenue is renting office cubicles to customers. Each cubicle is 200 square feet and contains a desk, chair, filing cabinet, computer with Internet access, printer, and telephone. Each Offices on the Go site maintains 15 such cubicles, and the monthly depreciation on cubicle furniture and equipment totals $500.
* Copy and fax documents for customers. The copy and fax center contains 5 self-service copiers and 3 fax machines. Monthly depreciation on those items totals $250. The copy and fax center occupies 1,500 square feet.
* Maintain company operations. Store #2 employs one bookkeeper at a salary of $3,000 per month and one human resource manager at a salary of $2,800 per month. Their offices contain the same equipment as the purchasing agents with the same depreciation charges; both the bookkeeper and the human resource manager occupy 500 square-foot offices.
* Sell office supplies to customers. Office supply displays occupy 1,000 square feet. The display racks were replaced at a cost of $1,500 last month and were expensed at that time.
* Ring up sales and collect payments. Priscilla employs 10 part-time customer service representatives. Each representative works between 25 and 30 hours per month at $12 per hour. The customer service counter and related equipment (such as cash registers) occupy the remaining 500 square feet.
In addition to costs for the above activities, Store #2 incurs the following costs every month: rent, $1500; utilities, $600; and maintenance, $800. Each month, 25% of profits are sent to the corporate office to help cover corporate expenses.
- Store #2 currently uses a traditional costing system, allocating indirect costs to its three product lines (office space rental, copy and fax services, and office supplies sales) based on direct labor hours. Analyze the strengths and weaknesses of the current system from the perspective of the store manager. Explain why an activity-based costing system will or will not provide better information for making decisions.
- Store #2 currently uses a traditional costing system, allocating indirect costs to its three product lines (office space rental, copy and fax services, and office supplies sales) based on the number of customers in each area. If an individual customer purchases goods or services from more than one area, they are counted with the area in which they provide the most revenue. Explain how the current system is both similar to and different from an activity-based costing system.
- Activities in an ABC system often are classified as one of six types: organization-sustaining, facility-sustaining, customer-sustaining, product-sustaining, batch-level, or unit-level. Using the list above and your own creativity, suggest one example of each activity type for Offices on the Go. Your organization-sustaining activity should focus on the corporate office; all the others should be focused on Store #2.
- List and discuss the steps you would use to assign costs in Store #2’s ABC system.
- One of the steps in designing an ABC system is assigning costs to ABC cost pools. Another step is selecting a cost driver for each pool. Based on the preceding narrative, suggest two cost pools for Priscilla’s store. For each cost pool, suggest two potential cost drivers. Explain your choices of cost pools and cost drivers.
- As you are completing the project for Priscilla, her bookkeeper shows some resistance to the ABC system. He comments: “We’ve always done just fine allocating costs using direct labor hours. Now you’re complicating matters by talking about cost pools, cost drivers, and allocation bases. I don’t understand why we can’t just continue doing things the old way!” Explain the similarities and differences between cost drivers and allocation bases, and respond to the bookkeeper’s concerns.
- You have completed the first part of your task, designing the ABC system. Priscilla also wants you to begin working with her on an activity-based management system for Store #2. In your own words, define activity-based management. If you and Priscilla work together to improve operations using the ABC information, explain why it is impossible to be certain that Store #2 will achieve any benefits.
- The Copy-Mart is a copy center located next to a university. The store provides a wide range of services for faculty and students, including copying, digital photo printing, providing computer time and technical support for word processing, and other miscellaneous services. The store manager has been concerned about quality problems that have recently increased. Customers have been returning copies because pages are missing or unreadable, and new copies must be made. Complaints have also been received about the quality of technical support, and the computer systems have been subject to frequent viruses and crashes.
ABC information can be used in an ABM system to manage quality. In such cases, quality costs are often classified as related to prevention activities, appraisal activities, production activities, or postsales activities.
- Define each type of quality-related activity in your own words.
- Based on the information above and your own creative thinking, give one example of each activity type for Copy-Mart.
- Suppose the managers of Copy-Mart implement an ABC system to measure the costs of quality. How could they use information from this system to improve operations?
Answers
True / False
- T
- F
- F
- F
- T
- T
- F
- T
- F
- F
- T
- T
- T
- T
- F
- F
- T
- F
- T
- F
- T
- T
- T
- T
- T
- T
- T
- F
- T
Multiple Choice
- A
- B
- A
- C
- C
- C
- B
- A
- C
- C
- B
- A
- B
- B
- A
- C
- C
- D
- B
- B
- A
- C
- C
- C; $1,800 * 2 / 14
- C
- C; Revenue = 200 * $50; Rent = $2,500 * 25%; Custodial = $1,800 * 25%; Utilities = $600 * 25%; Depreciation = 800 * 24 / 67
- C
- B
- A
- C
- A
- B
- C
- A
- D
- A
- A
- B
- A
- D
- A
- C
- B
- B
- C
- C
- A
- A
- B
- D
- B
- B
- A
- C
- C
- A
- B
- B
- B
- C
- C
- D
- A
- A
- C
- C
- A
- B
- A
- A
- D
- C
- A
- D
- B
- A
- A
- B
- D
- C
- C
- B
- C
s84. D
s85. B
s86. D
s87. D
s88. B; (1500/4000) x $100,000 = $37,500
s89. D; (400/700) x $200,000 = $114,286
s90. B; A/P $62,500 + HR $114,286 + A/R $50,000 + Comp network $150,000 = $376,786
s91. A; A/P $37,500 + HR $85,714 + A/R $100,000 + Comp network $100,000 = $323,214
s92. D
s93. B
s94. A
s95. D
s96. D
w97. C
w98. A
w99. A
w100. C
w101. A
w102. C
w103. A
w104. A
w105. D
w106. B
w107. D
w108. C
w109. B
w110. A
w111. D
w112. A
w113. B
Matching
- Traditional Versus Activity-Based Costing
- X
- B
- A
- B
- T
- X
- B
- A
- T
- B
- Cost Hierarchy
- A
- D
- C
- A
- E
- C
- B
- A
- B
- A
- Assigning Costs in ABC System
3 Assign costs to activity-based cost pools
5 Calculate an allocation rate for each cost pool
4 Choose a cost driver for each cost pool
6 For each ABC cost pool, allocate activity costs to the cost object
2 Identify activities
1 Identify the relevant cost object
- ABC Cost Allocations
- C
- H
- F
- J
- L
- J
- E
- K
- D
- J
Computations are shown in the Excel spreadsheet below:
- Cost Drivers
- A
- F
- F
- B
- A
- A
- C
- D
- C
- H
- Quality Activities
- C
- A
- B
- D
- B
- C
- C
- B
- D
- A
- ABC and ABM
- D
- G
- H
- A
- J
- I
- K
- E
- C
- B
Exercises
- a. Traditional allocation:
Total overhead = $58,000
Direct labor hours for plain pillows = 8,000 x 0.25 = 2,000
Direct labor hours for fancy pillows = 10,000 x 0.50 = 5,000
Total direct labor hours = 7,000
Traditional allocation rate = $58,000 / 7,000 = $8.29
Total cost plain = $1.25 + $2.00 + $8.29 (1/4) = $5.32
Total cost fancy = $1.50 + $4.00 + $8.29 (1/2) = $9.65
- Activity-based allocation
Cutting overhead = $16,000
Total cuts for plain pillows = 10,000
Total cuts for fancy pillows = 10,000
Cutting cost allocated to plain pillows = $8,000; cost per unit = $8,000 / 8,000 = $1.00
Cutting cost allocated to fancy pillows = $8,000; cost per unit = $8,000 / 10,000 = $0.80
Machine setup overhead = $27,000
Total setups for plain pillows = 10
Total setups for fancy pillows = 5
Setup cost allocated to plain = $18,000; cost per unit = $18,000 / 10,000 = $1.80
Setup cost allocated to fancy = $9,000; cost per unit = $9,000 / 8,000 = $1.13
Maintenance overhead = $15,000
Total DLH for plain = 2,000
Total DLH for fancy = 5,000
Maintenance cost allocated to plain = $4,286; cost per unit = $4,286 / 10,000 = $0.43
Maintenance cost allocated to fancy = $10,714; cost per unit = $10,714 / 8,000 = $1.34
Total cost plain = $1.25 + $2.00 + $1.00 + $1.80 + $0.43 = $6.48
Total cost fancy = $1.50 + $4.00 + $0.80 + $1.13 + $1.34 = $8.77
- Under traditional costing, the plain pillows allocation ($5.32) was a little less than half of the allocation for fancy pillows ($9.65). The difference between the two is $4.33. Under ABC the difference was only $2.29 ($8.77 – $6.48). Therefore, fancy was cross-subsidizing plain, that is, plain was not assigned as much overhead cost as it should have been.
- Organization-sustaining = $395 + $460 + $665 = $1,520
Facility-sustaining = $250 + $775 = $1,025
Customer-sustaining = $860
Product-sustaining = $320
Batch-level = $0
Unit-level = $200
- a. Communications = $16,000 / (6 + 4 + 6) = $1,000 per memo
Human resources = $21,000 / (20 + 50 + 30) = $210 per employee
Maintenance = $18,000 / (5 + 7 + 6) = $1 per square foot
- The allocation rate for communications indicates that the average cost of producing a memo is $1,000. The allocation rate for human resources indicates that it costs on average $210 per employee to perform human resource services. The allocation rate for maintenance indicates that it costs on average $1 to maintain each square foot.
- Arcades Food and
and Shows Beverage Rides Total
Communication $ 6,000 $ 4,000 $ 6,000 $16,000
Human resources 4,200 10,500 6,300 21,000
Maintenance 5,000 7,000 6,000 18,000
Total $15,200 $21,500 $18,300 $55,000
- Arcades Food and
and Shows Beverage Rides Total
Revenues $50,000 $125,000 $150,000 $325,000
Direct costs 8,000 6,000 4,000 18,000
Allocated costs 15,200 21,500 18,300 55,000
Profit $26,800 $ 97,500 $127,700 $252,000
- a. Total costs in the processing pool are $30,000 + $20,000 = $50,000
- Students could provide logical arguments for using machine hours or percentage of oranges harvested, but machine hours would most accurately reflect the machine related costs of processing. Following is a typical answer.
The best cost driver for the processing activity is machine hours because it reflects use of the machines for processing and most of the costs in the cost pool are probably related to machines. As the machines run longer, costs are likely to increase. The allocation rate is then $50,000/320 = $156.25/machine hour
- Total processing costs are $156.25 x 80 = $12,500 for concentrate and popsicles, and $156.25 x 160 = $25,000 for orange juice.
Short Answer
- Customer-sustaining activities are the activities that organizations undertake for their customers. These activities are not driven by sales or production volumes or mix. An example would be the post-sales costs that Dell Computer incurs for technical support.
- The activities and one example each are shown below (see Exhibit 7.3 for additional examples); student examples are likely to vary.
Organization-sustaining costs, CEO salary
Facility-sustaining costs, property taxes for the plant
Customer-sustaining costs, customer market research
Product-sustaining costs, product line supervisor’s salary
Batch-level costs, set-up costs
Unit-level costs, material handling wages
- ABM could be used to identify and minimize any costs related to the environment. For example, disposal costs for hazard waste could be compared to the cost of redesigning the product to eliminate waste. Without ABC and ABM, managers may not have the information about costs and processes they need to identify the cost consequences of their decisions with regard to environmental practices.
- Prevention activities – designing defect-free products, appraisal activities – inspection of units or direct materials used in units, production activities – cost of spoilage and rework, postsales activities – repair work done for product warranties. (See exhibit 7.6 for more examples.)
- Some organizations incur a wide range of costs to service customers. If some customers use relatively more resources, the organization may want to minimize costs for these customers or charge them extra for some services. To do this, costs must be tracked on a per-customer level.
- ABC helps organizations better understand the underlying patterns of resource use and better map costs to the use of these resources. This can help identify and eliminate non-value added activities. However, ABC can be costly and time consuming to implement. Further, employees may be resistant to using the information once it has been developed. Students will have thought of other answers as well.
- Activity based management is the process of using ABC information to evaluate costs and benefits of production and internal support activities. ABM can be used to identify non-value added activities and to improve processes and activities for organizations.
- Students are asked to provide 2 advantages and 2 disadvantages of implementing an ABC system. Below are several advantages and disadvantages; students may think of others.
Advantages:
Increase awareness of cause-and-effect relationships
Promote performance improvements
Identify non-value-added activities
Motivate cost reduction
Reduce arbitrariness in cost measurement
Optimize use of constrained resources
Disadvantages:
May require accounting system modifications
ABC may be more difficult to implement and use; need employee training
Can results in higher costs, particularly when activities and the system are complex
ABC costs may be inappropriately viewed as variable costs
- Here are some uncertainties that arise when managers are developing cost pools under an ABC system; students may think of others. Cost pools are related to an organization’s activities, and it is not possible to know whether all relevant/important activities have been identified. Some activities may be overlooked, or the set of activities may include ones that rarely occur and would be an immaterial part of operations. In addition, uncertainties exist about whether the system would be more or less accurate when potentially separate activities are grouped together. Uncertainties also exist about whether multiple cost pools should be developed for a single activity. Managers may wish to create separate cost pools for committed and flexible costs, but it is not always clear whether the benefit of separating these costs exceeds the cost. Another uncertainty about cost pools relates to the availability of appropriate cost drivers. The benefits of developing additional cost pools depend on the ability to identify and measure a cost driver for each pool.
- Each cost pool could have errors in the measurement of costs assigned to the pool. Further measurement error could arise in tracking the number of events for each cost driver. When the number of cost pools (and cost drivers) increases, the effects of these errors tend to magnify, and measurement error can quickly increase.
- Students are asked to discuss the pros and cons of using a team of individuals to develop an ABC/ABM system. Examples of pros and cons that may be discussed are listed below; students may think of others.
Pros:
Team members bring different types of knowledge and perceptions about the company to the team meetings
Diversity increases creativity
Diversity increases the likelihood that appropriate issues will be considered as choices are made about activities and cost drivers
A system developed by a team may obtain greater support throughout the organization
Cons:
Working within a team can slow down the process of developing and implementing a system
Sometimes only a few members of a team are actively involved even though all team members are present, and this could be a poor use of time for those who are uninvolved.
- Students are asked to discuss the similarities and differences between ABC, GPK, and RCA
Similarities:
Multiple allocation bases
Refined costing system
Differences:
Treatment of idle/excess capacity
GPK/RCA focus on encouraging managers to use resources effectively
GPK focuses on marginal costs for short term decision making
Problems
- a. Allocation rate = $500,000/500 hours = $1,000 per employee hour
Check processing gets (150/500 x $500,000) = $150,000
Loan processing gets 260/500 x $500,000 = $260,000
Other services are allocated the remaining $90,000
- Cost for Buggies using office-wide rate = 11 x $1,000 = $11,000
- Allocation rates:
Credit risk assessment = $120,000/60,000 = $2 per assessment
Loan processing = $200,000/260 = $769/employee hour
Miscellaneous services = $180,000/9,000 = $20 per event.
Total costs for Desert Dune Buggies:
Credit risk assessment ($2 x 1,000) $2,000
Loan processing ($796 x 8) 6,368
Misc. Services ($20 x 80) 1,600
Total $9,968
- Under the office-wide rate system, the overhead costs were combined into a single cost pool and then allocated based on employee time. Employee time may or may not be related to costs in the overhead pool. However, under ABC the overhead costs are divided into three cost pools that relate to specific types of services performed. The cost pools are then allocated using cost drivers that are more likely to reflect the use of resources. The cost driver for loan processing (employee time) is the same as under the office-wide rate. However, the cost drivers for the credit risk assessment and miscellaneous services differ from the allocation based used under the office-wide rate. Therefore, the ABC allocations more closely match the use of resources.
- The information provided in the problem does not indicate how much of the overhead costs are fixed versus variable. If a high proportion of the overhead costs are variable, then the ABC allocations would probably provide a reasonable estimate of the incremental overhead cost for the Desert Dune Buggies account. However, overhead often includes a large proportion of fixed costs. In that case, the ABC allocation would not provide a reasonable estimate of incremental overhead cost.
- a. 1. Under a traditional costing system, the allocated overhead costs would be as follows:
DL hours = (11,000 + 4,000) x 1.5 = 22,500
Overhead allocation rate = $4,800,000/22,500 = $213.33 per DL hour
Heatilator overhead allocation = 1.5 x $213.33 = $320
Heat Queen allocation = $320
- Allocations under an ABC system:
ABC Allocation Rate Heatilator Heat Queen
Soldering $ 2.40 $ 711,000 $ 231,000
Shipments 172.00 696,600 163,400
Quality Control 64.00 899,200 340,800
Purchase Orders 20.00 400,500 549,900
Machining 1.20 52,800 4,800
Machine set-ups 100.00 400,000 350,000
Total cost $3,160,100 $1,639,900
Cost of allocations per unit $287.28 $409.98
Direct materials 200.00 280.00
Direct Labor (1.5*$20) 30.00 30.00
- In general, ABC systems do a better job than traditional costing systems of measuring the cost of resources used. However, neither system in this problem measures fixed and variable overhead costs separately. Therefore, neither system measures the relevant (i.e., incremental) cost associated with the two products.
- To eliminate non-value-added activities, it helps to develop an ABC system because the activities performed will be carefully analyzed and costs assigned to them. This process helps in identifying those activities that do not provide customer value. Examples include warranty costs or spoilage. Once these activities are identified, using ABM they can be eliminated or minimized. For example spoilage, rates could be reduced through analyzing the processes that result in spoiled units.
- a. From the store manager’s perspective, the current traditional system is straightforward and easy to implement. It does not take a lot of time to calculate costs, leaving the manager free to concentrate on other duties. On the other hand, the manager may be making less-than-optimal decisions, as she is not receiving the most accurate and relevant information about costs from the accounting information system. The inaccurate accounting information likely translates into inappropriate pricing for customers as well. An activity-based costing system will probably provide better information for decision making. An ABC system will focus on the activities that actually create costs, and will allow the store manager to determine which product lines are most profitable.
- The current system is similar to an ABC system in that it allocates overhead to cost objects. But, the similarities end there. The current system does not establish cause-and-effect relationships between allocation bases and costs. Additionally, we do not know how many cost pools the company uses in its current system. However, the number of cost pools is likely to be fewer than would be established in an ABC system.
- Examples of activities for each level in the hierarchy are provided below; students will think of other examples.
Organization-sustaining: corporate accounting services
Facility-sustaining: purchasing office supplies
Customer-sustaining: advertising in local business-oriented hotels
Product-sustaining: arranging office supplies for display
Batch-level: reporting weekly revenues to the corporate office
Unit-level: preparing a bill for an individual customer
- Assigning costs in an ABC system involves six steps, as noted in the chapter:
Identify the relevant cost object.
Identify activities.
Assign costs to ABC pools.
Choose a cost driver for each pool.
Calculate an allocation rate for each cost pool.
Allocate each pool’s cost to the cost object.
- Priscilla could establish any number of cost pools based on the narrative. One pool could be purchasing costs. Purchasing costs could be allocated based on # of purchase orders processed or # of vendors. Another pool could include facility-level costs, such as rent, utilities and maintenance. Those costs could be allocated based on square feet occupied or number of employees and customers per area.
- A cost driver is a special type of allocation base. A cost driver is an activity that actually creates a cost; an allocation base may or may not be a cost driver. Although cost drivers make the best allocation bases (denominator in the allocation rate), some costs may not have clear cost drivers. While the bookkeeper’s concerns are certainly valid, Priscilla should probably point out that the ABC information will allow for better decision making.
- Activity-based management refers to using activity-based costing information to improve a company’s operations. ABM can focus on a number of applications, including customer profitability, quality costs, and process improvements. Even if Priscilla and the consultant work together to improve operations, they are not assured of achieving any benefits. Employee resistance may work against the improvements; also, as a branch of a corporate office, Priscilla may be constrained by corporate rules and regulations.
- a and b:
Prevention activities are related to preventing or eliminating defective units or services by designing manufacturing and service delivery processes to produce only good units or services. Examples of prevention activities include establishing minimum qualifications for suppliers of ink cartridges, paper, copy machines, and inspecting incoming supplies to make sure they meet quality standards.
Appraisal activities examine units in an effort to identify defects. Defective units are then discarded or reworked. For example, a company may employ quality inspectors to look at a sample of finished units before they leave the company. At Copy-Mart, one or more employee may check large orders to be certain they are correctly prepared and that all copies are high quality. Any orders that have quality problems can be redone before customers pick them up.
Production activities focus on reworking units that fail to meet quality standards. Examples here include costs of scrap and rework. At Copy-Mart, copies that are unclear, poorly finished, or smudged need to be redone and the poor quality copies scrapped.
Post sales activities occur after the product is already in the customer’s hands, and can result in both financial costs (loss of repeat customers, for example) and psychological costs (poor employee morale because customers complain loudly and often). Warranty repairs and product replacements are examples of postsales activities. At Copy-Mart, postsales activities would be recopying an order that had quality problems or did not conform to customer instructions.
- The ABC system would help the managers improve operations in several ways. The system would help managers recognize quality-related costs, which would encourage them to seek ways to reduce those costs. The process of developing the ABC system would also help the managers better understand the various aspects of quality in their business, which in turn would improve their ability to identify opportunities for cost reduction and/or improvement in customer service. In addition, the managers could use the ABC system to establish goals for improvement, and the goals could be used to monitor and motivate improved employee performance.
S